Planning Permission Ireland
GrantedIndustrialDecided 17 May 2019

Collinstown Leixlip Blakestown Kellystown Kilmacredock Lower, Collinstown Industrial Park, Leixlip

A major extension to an integrated circuit manufacturing facility in Leixlip.

1991 · Kildare County Council · Lodged 1 February 2019

Reference
1991
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
1 February 2019

Summary

AI-generated

This application seeks a 10-year permission for a massive extension to a previously permitted manufacturing facility. The development includes a four-level manufacturing building extension of approximately 109,745 sqm, a link building, and revised utility support buildings.

Industrialintelfactoryexpansionleixlip
Storeys
4
Floor area
117,905 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

An extended and revised manufacturing facility (granted under an bord pleanála ref. Pl09.248582; kildare county council ref. 16/1229) including reconfigured and extended support buildings, water tanks and yards to provide for additional manufacturing capacity. The development will consist of buildings, site infrastructure and ancillary works, for the manufacture of integrated circuits. A 10 year planning permission is requested. The proposed development comprises: (1) manufacturing building extension to the previously permitted manufacturing building, over four levels (parapet height of 31sqm). The manufacturing extension to the permitted building will have a floor area of circa 109,745sqm. This will include support areas and roof mounted stacks and equipment, ranging in height from 6m to 25m above parapet together with its associated 4 level link building sized 8,160sqm and circa 31m high located to the east of the permitted manufacturing building with minor elevational alterations to the previously permitted manufacturing building. (2) manufacturing utility support building(s) revised design and configuration of previously permitted support buildings consisting of: i) a two level boiler and chiller building and associated roof mounted cooling towers, sized 22,188sqm and circa 24.5m high; (ii) a four level water treatment and compressor building, sized circa 11,992sqm and circa 27m high; (iii) a two level waste water treatment building, sized circa 4,974sqm and circa 17m high and a single storey analyser building sized 37sqm and circa 7m high, and its associated single storey electrical building sized 180sqm and circa 7m high; iv) a bulk gas and electrical yard with storage for gasses and liquids with roofed compounds sized 538sqm and circa 6m high and a single storey support building sized 73sqm and circa 6.5m high and an electrical yard housing transformers and 3 no. Electrical building sized 446sqm in total and circa 7m high; v) a 4 level structure housing 40 no. Emergency generators and their associated stacks circa 21m high and their 3 associated electrical buildings sized 200sqm gross and circa 4.5m high and their associated transformers. All the above buildings have roof mounted equipment and stacks ranging from circa 5m to 18m high. (3) water tanks, 8 no. Water tanks 38m in diameter and circa 10m high, and a single storey pumphouse sized 840sqm and circa 5m high. (4) site works, building links and yard equipment extension and revised

Land-use zoning

What this land is zoned for

Industry and WarehousingBP
To provide for industry, manufacturing, distribution and warehousing.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Leixlip LAP 2020-2023 (2020–2026). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 32 Louisa Park, Staition Road, LeixlipFeb 2025€308,000322 m
Apartment 64 Block D, Louise Park, Station Rd LeixlipOct 2025€262,500334 m
88 Louisa Park, Station Rd, LeixlipMar 2025€250,000345 m
82 Louisa Park, Leixlip, KildareApr 2026€321,500345 m
94 Louisa Park, Leixlip, Co KildareFeb 2026€290,000360 m
Apt 116 Block G2, Louisa Park, LeixlipJul 2025€310,000361 m
13 Louisa Park, Leixlip, KildareApr 2025€279,000362 m
105 Block F, Louisa Park, Station RdMar 2025€308,000371 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 February 2019
  2. Further information requested28 March 2019
  3. Further information received4 April 2019
  4. Decision due29 May 2019
  5. Decision issued17 May 2019
  6. Appeal submitted13 June 2019
  7. Appeal decided21 November 2019
  8. Permission expiry20 November 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.