RefusedEnergyDecided 4 January 2021

Rahilla Glebe, Dunmurry West and, Guidenstown South

A 10-year permission for a 49.74-hectare solar farm at Dunmurry Springs Golf Club.

201325 · Kildare County Council · Lodged 3 November 2020

Reference
201325
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
3 November 2020

Summary

AI-generated

Permission is sought for a 10-year period to construct a ground-mounted solar photovoltaic farm with an operational lifespan of up to 30 years. Located on a 49.74-hectare site, the development will feature solar panels on steel frames, a 38 kV substation, inverter units, and security fencing.

Energysolarrenewable energysubstation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Is sought for a period of 10 years with an operational period of up to 30 years for a ground mounted solar photovoltaic (pv) farm on a site area of 49.74 hectares within the site of the dunmurry springs golf club. The proposed development consists of solar photovoltaic panels covering an area of up to 92,024 m² on ground mounted steel frames; 1 no. 38 kv on-site substation/control room and palisade fencing; up to 10 no. Inverter/transformer container units; underground cabling and ducts; boundary security fence; use of existing entrance to public road at dunmurry springs golf club; new and upgraded internal access tracks; upgrade of an existing maintenance access onto the public road; construction of a maintenance shed; cctv cameras; 1 no. Temporary site compound; landscaping and all ancillary site services and works within the townlands of

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Neidin, Rahilla, KildareDec 2025€127,500481 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 November 2020
  2. Decision due6 January 2021
  3. Decision issued4 January 2021
  4. Appeal submitted29 January 2021
  5. Appeal decided22 October 2021
  6. Permission expiry21 October 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.