Awaiting decisionIndustrial

Redbog, Rathmore, Co. Kildare.

Backfilling of a sand and gravel pit in Kildare using over 8 million tonnes of imported soil and stone.

20814 · Kildare County Council · Lodged 24 July 2020

Reference
20814
Authority
Kildare County Council
Register status
Withdrawn
Type
PERMISSION
Received
24 July 2020

Summary

AI-generated

This application seeks to backfill an existing sand and gravel pit to its original ground level using approximately 8,225,000 tonnes of imported natural inert waste materials. It includes establishing an inert soil waste recovery facility operating at a maximum rate of 500,000 tonnes per annum, alongside associated site infrastructure.

Industrialquarrywaste recoverylandfill

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Backfilling a sand and gravel pit to its original ground level using approximately 8,225,000 tonnes of imported natural inert waste materials, principally soil and stone generated by construction and development projects; establishment and operation of an inert soil waste recovery facility to provide for the recovery through backfilling, of natural inert soil and stone waste, at a maximum rate of 500,000 tonnes per annum; installation of site infrastructure adjacent to the pit, including a weighbridge, a shared site/weighbridge office, staff welfare facilities, a paved refueling area with hydrocarbon interceptor and equipment/sample storage facilities. Construction of a portal frame structure for a waste inspection and quarantine facility; construction of an access ramp parallel to the southern pit face; use of an existing internal haul road across roadstone lands to the south (through doran’s pit, co. Wicklow), between a junction with the n81 national secondary road and the pit; widening of the access road into redbog pit to provide a separate access to third party lands and the erection of a security barrier and dividing palisade fence to restrict access to the recovery facility; progressive restoration of the backfilled landform to long-term grassland/agricultural use and installation of long term drainage/soakaway trenches. Planning permission is sought for period of up to 30 years. The proposed development requires a waste licence from the environmental protection agency. An environmental impact assessment report (eiar) will be submitted to the planning authority in connection with the application

Key dates

Timeline

  1. Application received24 July 2020
  2. Further information requested17 September 2020
  3. Application withdrawn15 April 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.