Planning Permission Ireland
GrantedAlterationsDecided 7 September 2022

203 Moorefield Park, Newbridge, Co. Kildare.

Phased design changes are proposed for a previously approved two-unit residential development in Newbridge.

22885 · Kildare County Council · Lodged 20 July 2022

Reference
22885
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
20 July 2022

Summary

AI-generated

The application seeks alterations to a previously granted permission. The changes will be completed in two phases, including boundary wall adjustments, floor layout reconfigurations, the removal of a previously approved rear extension, and the incorporation of an existing outbuilding.

Alterationsamendmentresidential

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Alterations to design previously granted under planning ref. No. 21/1775. The alterations include the following: construction of the development in 2 no. Phases consisting of
  • (a) phase 1 to include construction of external new 2.0m high wall/fence to form separate rear open spaces to both units and 1.0m high wall capped and plastered to front to form separate front garden open spaces; (b) removal of proposed rear extension granted under pl. Ref. 21/1775; (c) reconfiguration and alterations to existing floor layouts previously granted under pl. Ref. 21/1775. (d) and all ancillary works
  • Phase 2 to include the development of the proposed new second unit adjoining the original dwelling. (a) additional design alterations from previously granted design including upgrade and incorporation of existing outbuilding to rear of unit 2 as part of the reconfiguration; (b) removal of proposed rear extension granted under pl. Ref. 21/1775; (c) and all ancillary works

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
207 Moorefield Park, Newbridge, Co KildareNov 2025€340,00039 m
258 Moorefield Park, Newbridge, KildareJan 2026€400,000141 m
185 Moorefield Park, Newbridge, KildareJul 2025€295,000151 m
99 Moorefield Pk, Newbridge, KildareApr 2025€275,000182 m
97 Moorefield, Newbridge, Co KildareJul 2025€415,000183 m
159 Moorefield Park, Newbridge, Co Kildarenot full market priceAug 2025€120,000217 m
116 Moorefield Park, Newbridge, KildareJul 2025€425,000238 m
503 Milltown, Newbridge, KildareFeb 2025€350,000245 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 July 2022
  2. Decision due13 September 2022
  3. Decision issued7 September 2022
  4. Grant issued3 November 2022
  5. Permission expiry2 November 2027

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.