Planning Permission Ireland
GrantedEnergyDecided 11 May 2023

Porterstown, Kilteel Lower, Kill

Installation of battery energy storage units as a second phase of a grid services facility in Kill.

23276 · Kildare County Council · Lodged 20 March 2023

Reference
23276
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
20 March 2023

Summary

AI-generated

The development consists of a second phase of an existing grid system services facility on a 1.95-hectare site. It will install battery energy units, a customer switchgear container, electrical transformers, inverter units, and associated cabling to connect to the national grid.

Energybattery storagegrid infrastructureenergy

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the eirgrid gird connection infrastructure, site roads, 110kv substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. Customer switchgear container which will be connected to the national grid, via the existing infrastructure ,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, cctv, internal access road and all associated ancillary infrastructure on land at

The historical record

How energy applications have been decided in Kildare County Council

79% granted

of 107 energy applications granted, refused or part-granted by Kildare County Council, 2016–2026.

The same category nationally
89%2,347
All categories in Kildare County Council
81%11,885

These are historical figures for this category in this council area, counted from the statutory register over the last 10 years. They are not an assessment of this application and say nothing about how it will be decided.

Key dates

Timeline

  1. Application received20 March 2023
  2. Decision due14 May 2023
  3. Decision issued11 May 2023
  4. Grant issued10 July 2023
  5. Permission expiry9 July 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.