Planning Permission Ireland
RefusedHousing estateDecided 4 October 2023

Brallistown, Athy Road, Kildare County Kildare.

Construction of 96 housing units for the elderly, a creche, an administration building, and a sports pitch.

2360110 · Kildare County Council · Lodged 11 August 2023

Reference
2360110
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
11 August 2023
Residential units
96
Floor area
6307.2 m²

Summary

AI-generated

The development consists of 96 semi-detached single-storey bungalows for the elderly, featuring wheelchair-accessible ecology, butterfly, and sensory gardens. The plans also include a single-storey creche, an administration building, and a 5-a-side football pitch with training lights.

Housing estateelderly housingcrechesports pitchgardens
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of the following; (i) 96 no. Individual housing units for the elderly consisting of 2 bedroom semi-detached single storey bungalows, open space to include proposed wheelchair accessible ecology garden (249sq. M), proposed wheelchair accessible butterfly garden (329sq. M), proposed wheelchair accessible sensory garden (329sq. M), proposed outdoor seating area (134sq. M) (ii) single storey creche (468sq. M. ) to include 4no. Classrooms, w. C. ’s, sleep room, staff room, central kitchen, reception, office, store, an associated outdoor play area (1,030sq. M. ), wheelchair accessible sensory play area (304.6sq. M. ), building mounted signage (1.8sq. M. ), boundary treatments, 30 no. Car parking spaces (inclusive of 3 no. Accessible parking spaces) and set down area, covered bicycle stands and outdoor bin storage, (iii) 1 no. 5 aside football pitch 36.5m x 27.5m, 6 no. 18m high training lights and poles, all fencing and ball stop netting, 2m wide hard standing looped walkway around the perimeter of pitch, coach set down, 15no. Car parking spaces and covered bicycle stands (iv) single storey administration building (63.8sq. M. ) to include 2no. Offices and w. C. And all associated drainage connection works and site development works including esb substation and switch room, foul pumping station, foul and surface water drainage, landscaping, path lighting and boundary treatments, all at

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1083 Newtown, Kildare, KildareJul 2026€480,000363 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 August 2023
  2. Decision due5 October 2023
  3. Decision issued4 October 2023
  4. Appeal submitted31 October 2023
  5. Appeal decided22 November 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.