Killeenlea, Ardrass Lower & Killadoon, Celbridge
Extension of duration for a 47.44-hectare solar farm development near Celbridge.
24291 · Kildare County Council · Lodged 11 September 2024
- Reference
- 24291
- Authority
- Kildare County Council
- Register status
- Decided
- Type
- EXTENSION OF DURATION
- Received
- 11 September 2024
Summary
AI-generatedAn extension of duration is sought for a solar farm development with a 40-year operational lifespan. The project features ground-mounted solar panels, a 38kV substation compound, 25 inverter stations, security fencing, CCTV, and a new access road.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
For a solar farm development with an operational lifespan of 40 years comprising the installation of photovoltaic panels on ground mounted frames in rows on a site of circa 47.44 hectares, a single storey onsite 38kv substation with compound, with two number single storey storage containers, 25 number invertor stations, ducting and underground electrical cabling, perimeter fencing, 23 number mounted cctv cameras, provision of a new access from the l5066 / killadoon road, provision of internal access tracks, and all associated site development and landscaping works
Key dates
Timeline
- Application received11 September 2024
- Further information requested4 November 2024
- Further information received22 November 2024
- Decision due19 December 2024
- Decision issued12 December 2024
- Permission expiry11 December 2025
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted30 m away
The extension of the operational lifespan of the permitted solar pv development by An Bord Pleanála under…
Killeenlea , Ardrass Lower & Killadoon , Celbridge
2360037KildareLodged 14 Jul 2023Energy
- Granted30 m away
A 10 year permission (to construct development) for a solar farm comprising: the installation of photovoltaic…
Killeenlea Ardrass Lower & Killadoon , Celbridge , Co.Kildare
18250KildareLodged 12 Mar 2018Energy
- Awaiting decision290 m away
A single storey 4 bedroom detached dwelling with proprietary wastewater treatment system and ancillary…
site to the rear or 102 Killeenlea , Celbridge , Co. Kildare
17438KildareLodged 20 Apr 2017New dwelling
- Awaiting decision300 m away
For the extension of: a. Moving the front door to the side of the building; b. Construction of a new Kitchen,…
100 Killeenlea , Celbridge , Co. Kildare.
2560143KildareLodged 16 Feb 2025Extension
- Awaiting decision310 m away
The extension will consist of: a. Moving the front door to the side of the building; b. Construction of a new…
100 Killeenlea , Celbridge , Co. Kildare
2560084KildareLodged 1 Feb 2025Extension
- Granted310 m away
To construct an extension. The extension will consist of: A. Moving the front door to the side of the…
100 Killeenlea , Celbridge , Co. Kildare
2560163KildareLodged 20 Feb 2025Extension
- Granted320 m away
1.) A two-storey domestic extension to the rear of the existing dwelling including changes to the existing…
102 Killeenlea , Celbridge , Co.Kildare
21288KildareLodged 9 Mar 2021Extension
- Granted350 m away
The retention of a storage building to the rear of the existing dwelling
Glencraig , Killeenlea , Celbridge
23119KildareLodged 10 Feb 2023Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
A 10 year permission (to construct development) for a solar farm comprising: the installation of photovoltaic…
Killeenlea Ardrass Lower & Killadoon , Celbridge , Co.Kildare
18250KildareLodged 12 Mar 2018
- GrantedEnergy
Construction of an up to 5MWp Solar PV farm, with a maximum export capacity of 4 MW comprising approximately…
Teadies Upper, Enniskeane, Co. Cork,
176441corkLodged 21 Sept 2017
- GrantedEnergy
The development of a solar photovoltaic panel array consisting of up to 28,500m2 of solar panels on ground…
Townland of Piercetown and Ballginnane, Near Carrigaline, Co.Cork,
174039corkLodged 13 Jan 2017
- GrantedEnergy
Construction, operation and decommissioning of photovoltaic solar farm comprising photovoltaic panels on…
Ballyvatta and Clash, Knockraha, Leamlara, Co. Cork
175370corkLodged 2 Jun 2017
- GrantedEnergy
For the development of a solar PV panel array comprising photovoltaic panels on ground mounted frames within…
Taduff West Taduff East Creagh and Curraghaleen , Athlone South , Co. Roscommon
2036RoscommonLodged 31 Jan 2020
- GrantedEnergy
10 years (to construct development) for a solar farm comprising: the installation of photovoltaic panels on…
Nonsuch , Castlepollard , Co Westmeath
176361WestmeathLodged 19 Dec 2017
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.