Planning Permission Ireland
RefusedApartmentsDecided 15 December 2025

6 Leinster Street, Athy, Co. Kildare

Conversion of a single dwelling into two self-contained apartments in Athy.

2561199 · Kildare County Council · Lodged 22 October 2025

Reference
2561199
Authority
Kildare County Council
Register status
Decided
Type
PERMISSION
Received
22 October 2025

Summary

AI-generated

This application seeks internal alterations and refurbishment to convert an existing single dwelling into two self-contained apartments. The property is a protected structure (AYO59) and will contain one two-bed and one one-bed apartment.

Apartmentsconversionapartmentsprotected structure
Residential units
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Internal alterations and refurbishment to convert a single dwelling into two self-contained apartments (1no. Two-bed at first floor and 1no. One-bed at ground floor) and all associated site works (protected structure ayo59)

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Leinster St, Athy, KildareJul 2025€310,0007 m
54 Leinster St, Athy, KildareSept 2025€171,00078 m
9 St Michaels Terrace, Athy, KildareMar 2026€315,00093 m
9 The Grove, Leinster St, AthyApr 2026€230,000151 m
6 The Grove, Leinster St, AthyApr 2026€175,000151 m
2 The Grove, Leinster St, AthyMay 2026€202,000153 m
Apartment 2 Ground Floor, Stanhope Place, AthyAug 2025€34,180162 m
Apartment 3 First Floor, Stanhope Place, AthyAug 2025€33,340162 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 October 2025
  2. Decision due16 December 2025
  3. Decision issued15 December 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.