GrantedInfrastructureDecided 21 April 2023

St Kieran's College, College Road, Kilkenny

Demolition of several school buildings and construction of a new school facility at St Kieran's College.

22588 · Kilkenny County Council · Lodged 6 September 2022

Reference
22588
Authority
Kilkenny County Council
Register status
Decided
Type
PERMISSION
Received
6 September 2022

Summary

AI-generated

The project involves the demolition of multiple classroom, changing room, toilet, and VEC blocks within the curtilage of Protected Structures. It will construct 7,834 sqm of new school accommodation, install PV panels, and refurbish the protected 1933 building.

Infrastructureschooldemolitionprotected structuresolar
Floor area
7,834 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For development. This development will consist of works, all within the curtilage of protected structures as described below. Demolition of single storey 5 no. Classroom block (320.5sqm), two storey changing room block (402sqm), three storey toilet block (55.5sqm), part demolition of single storey toilet block (204sqm), all attached to the north of the 1933 protected structure, demolition of a single storey bantile structure (241.6 sqm) to the west and of a single storey glass corridor (287.2sqm) to the south of the 1933 wing. Demolition of a two storey vec building (4292sqm), removal of associated car park and existing gates/pillars to lower new street. Construction of 7834sqm of new general and specialist classrooms, general purpose space, special needs unit and ancillary accommodation in part three, part two and part single storey accommodation, located to the north and west of the protected 1933 wing with pv panels on the new single storey roof. Refurbishment internally of the 1933 building/doody wing (2635.2sqm) to provide administration, library and teaching spaces, re-rendering of 1933 wing externally and refurbishment of existing timber windows. Creation of a new quadrangle space enclosed to south of 1933 building with the 19th century protected structure. Refurbishment of existing detached gym internally and fully recladding externally with new roof glazing and fenestration to lower new street, single storey extension to gym (199sqm) to south west providing replacement changing facilities. New entrance avenue with new gates/pillars and associated lighting from reconfigured entrance to lower new street, part over cladding with stone of existing concrete site boundary wall/piers and railing replacement along with associated works to foot path on lower new street. Construction of a 90 no. Space car park to south east of protected structure with new 28sqm electrical substation adjacent. Proposed 3 no. Additional universal access car parking and 348 no. Bicycle parking. Opening in stone boundary wall to college road and relocation of gas skid to provide construction and fire tender access during construction, reinstatement upon completion. Construction of a 65sqm external store with enclosed heat pump enclosure to west of the new single storey classroom accommodation. Provision of temporary modular teaching accommodation (368.4sqm) within future new quadrangle during construction phase

Land-use zoning

What this land is zoned for

Community FacilitiesCI
To protect, provide and improve community facilities

National zoning type: Mixed/general community services/facilities uses

Objective set by the Kilkenny City and County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Rose Cottage, New St, KilkennyApr 2025€555,000184 m
1 Ormonde Road, Kilkenny, Co KilkennyJan 2025€290,000208 m
33 Walkin St, Kilkenny, KilkennyNov 2025€300,000220 m
43 Walkin St, Kilkenny, KilkennyApr 2025€220,000227 m
30 Desert Court, Ormonde St, KilkennyAug 2025€221,000238 m
49 Old Callan Rd, Callan Rd, KilkennyDec 2025€270,000239 m
37 Desart Court, Ormond St, KilkennyJul 2025€255,000240 m
7 Upper New St, Kilkenny, KilkennyOct 2025€370,000253 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 September 2022
  2. Further information requested27 October 2022
  3. Further information received28 March 2023
  4. Decision due24 April 2023
  5. Decision issued21 April 2023
  6. Grant issued24 May 2023
  7. Permission expiry23 May 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.