Planning Permission Ireland
GrantedInfrastructureDecided 8 October 2025

Newtown School, Newtown Road, Waterford

Extension of duration for major school redevelopment at Newtown School, Waterford.

2584 · Waterford City and County Council · Lodged 4 July 2025

Reference
2584
Authority
Waterford City and County Council
Register status
Decided
Type
EXTENSION OF DURATION
Received
4 July 2025

Summary

AI-generated

An extension of duration is sought for major school redevelopment works within the curtilage of a protected structure. The works include the demolition of several 20th-century classroom blocks and the construction of a new three-storey classroom block, a new entrance block, a special needs unit, and a PE sports hall.

Infrastructureschoolprotected structuredemolition
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Extenstion of duration of pl. File 19/47 for works,all within the curtilage of protected structure as described below:forming a new recessed vehicular&pedestrian entrance off passage rd; demolition of 20th century classroom blocks (glynn,jacob,webster,foster & penn) on the wilkin st side of the school complex &construction of a 4624sqm three storey block with general & specialist classrooms & pv panels to roof;demolition of 20th century entrance block between the dining hall&library&the construction of 611sqm two storey entrance block with reception,administration,social/locker areas&staff facilities;demolition of the southern 20th century section of the bio-laboratory&construction of a 500sqm,single storey special needs unit. The northern section of the bio-lab will be retained as an archive museum;demolition of entrance lobby to foy hall&the construction of a 162sqm vertical circulation core&social/locker area;demolition of 4classrooms attached to the swimming pool complex&the construction of a 1149sqm pe sports/assembly hall&a single storey changing&fitness suite with pv panels to roof;alterations to existing buildings&the construction of a 120sqm part single storey, part 2storey horizontal circulation spine from wyse house to the bio-lab, with an extended covered link to the new classroom block;alterations to the dining room&classroom block to form 2 levels with dining facilities,connected with a new staircase,refurbishment of wyse house&insertion of new lift&part new staircase to facilitate its use as general classrooms&associated facilities. Wyse house is a protected structure, refurbishment of the library block including the replacement of the two 20th century roof lanterns. The library is a protected structure;relocation of 2 single storey storage containers to the west of the swimming pool&to the east of the new entrance. Total area of new build&refurbishment is 9,289sqm;provision of hard&soft landscaping with new set down area,car parking,new storm water attenuation system&play areas. Any felled trees will be replaced;provision of a temporary construction entrance off wilkin st; construction of 26no temporary car spaces adjacent to the main entrance for the duration of the construction programme;provision of a temporary 2 storey modular classroom block&a single storey dining&locker area with a combined floor area of 2,396sqm;provision of a combined roadway&fire path adjacent to the wilkin st& passagerd boundary wall together with a 74sqm extended sto

Land-use zoning

What this land is zoned for

CICI
Provide for and protect civic, educational, religious, community, health care and social infrastructure.

National zoning type: Community facilities

Objective set by the WCCC Development Plan 2022 - 2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
27 Passage Rd, Waterford, WaterfordJul 2025€370,000141 m
22 Passage Rd, WaterfordApr 2026€355,000147 m
St Anthonys, Newtown Park, WaterfordNov 2025€270,000165 m
2 Wilkins St, Waterford, WaterfordJul 2025€297,500189 m
Brentwood, Newtown, Co WaterfordSept 2025€1,410,000193 m
Apt 4b - Newtown Court, Newtown Road, WaterfordOct 2025€260,000217 m
11 Grange Park Rd, Waterford, WaterfordMar 2026€510,000230 m
6 Grange Park Rd, Waterford, Waterfordnot full market priceAug 2025€337,500230 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 July 2025
  2. Further information requested27 August 2025
  3. Further information received17 September 2025
  4. Decision due14 October 2025
  5. Decision issued8 October 2025
  6. Permission expiry2 August 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.