Planning Permission Ireland
Awaiting decisionEnergy

Ballymacken, Portlaoise, Co. Laois

Construction of a 2-hectare ground-mounted solar farm with a switch room and new access road.

2460789 · Laois County Council · Lodged 19 December 2024

Reference
2460789
Authority
Laois County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
19 December 2024

Summary

AI-generated

The application seeks permission to construct, operate, and decommission a photovoltaic solar farm over a 2-hectare site. The development will include ground-mounted solar panels, a switch room building, perimeter fencing, and a new site entrance serving both the solar farm and an existing sawmill.

Energysolarrenewablegreen energy
Floor area
20,000 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Construct, operate and decommission a photovoltaic solar farm over an area of 2 hectares comprising of photovoltaic panels on ground mounted frames, a switch room building, perimeter fencing, hardcore access tracks with underground ducting routes, landscaping, new site entrance and access road to solar farm and existing sawmill facility, surface water drainage with underground attenuation tank, revision of existing site boundaries along with all associated ancillary development works.

Key dates

Timeline

  1. Application received19 December 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.