Planning Permission Ireland
Awaiting decisionCommercial

Portlaoise GAA, Rathleague Portlaoise, Co. Laois

Demolition of existing GAA clubhouse and construction of a major new clubhouse, grandstand, and indoor training facility.

2560298 · Laois County Council · Lodged 16 May 2025

Reference
2560298
Authority
Laois County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
16 May 2025

Summary

AI-generated

The development at Portlaoise GAA involves demolishing the existing 1,567 sqm clubhouse and outbuildings. A massive new 10,122 sqm facility will be built, featuring an indoor training field, changing rooms, gym, café, town hall, and spectator seating. Pitch upgrades, including new floodlighting and an all-weather synthetic pitch, are also proposed.

Commercialsportsclubhousedemolitionrecreation
Floor area
10,122 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Develop the following
  • Demolition of existing structures on site to include existing clubhouse and associated outbuildings (c. 1,567 sqm overall)
  • Construction of a new clubhouse, grandstand, and indoor training facility measuring c. 10,122 sqm gfa to include: an indoor training field (c. 6,175 sqm), changing rooms, communal areas, café/merchandise shop, town hall, gym, physio room, comms room, a function room and associated kitchen, bar, 2 no. Meeting rooms, 4 no. Outdoor handball courts, plant rooms, esb substation, and ancillary storage rooms
  • Amendments to the layouts of existing 5 no. Natural grass outdoor training pitches, including spectator fencing and 400 lux floodlighting to 1 no. Natural grass pitch, realignment of ball stop netting, and associated works
  • Conversion of existing grass pitch to 1 no. All weather synthetic pitch, with the inclusion of new floodlights (400 lux), spectator fencing, ball stop netting and associated works
  • Provision of 4 no. Dug outs and 2 no. Scoreboards
  • 1 no. Spectator seating terrace measuring 11.16m in height with seating capacity for c. 420 no. Spectators
  • Relocation of the existing car park to provide 227 no. Car parking spaces (to incl. 13 no. Accessible spaces and 23 no. Ev spaces), bus set down area and 4 no. Bus sparking spaces, with additional overflow parking available
  • Works to the r425 road to provide traffic calming measures in the form of concrete buildouts, islands, a pedestrian crossing, and associated line marking and signage
  • The re-design of the existing vehicular entrance along the r425 road to provide pedestrian/cycle access
  • Provision of a new emergency vehicle entrance only onto the r425
  • Provision of 227 no. Cycle parking spaces
  • Provision of static storage for firefighting
  • Amendments to and the extension of the existing amenity track and lighting
  • All associated boundary treatments including the retention of existing hedgerow along all boundaries
  • All associated site development works and services, including foul water pumping station and rising main, irrigation well with pump, and all associated hard and soft landscaping including mounding, footpaths, pitch fencing, planting and landscaping works

Key dates

Timeline

  1. Application received16 May 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.