RefusedInfrastructureDecided 8 May 2018

Boleymaguire and Seltan, Co. Leitrim

Installation of underground cable ducting and remedial works to connect a wind farm.

1845 · Leitrim County Council · Lodged 14 March 2018

Reference
1845
Authority
Leitrim County Council
Register status
Decided
Type
PERMISSION
Received
14 March 2018

Summary

AI-generated

The project involves installing 0.46km of underground cable ducting, a joint bay, and fixing a steel box structure to Boleymaguire Bridge. It also includes remedial works to 0.44km of existing ducting to facilitate the connection of the permitted Derrysallagh Wind Farm.

Infrastructuregrid connectionwind energyinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For the installation of approximately 0.46km of underground cable ducting, 1 no. Joint bay and ancillary development laid primarily within the public road corridor, with a section of circa. 0.07km within private lands at seltan. A section of ducting is to be installed within a steel box structure to be fixed to boleymaguire bridge within the townland of boleymaguire, co. Leitrim. Within the townland of boleymaguire, permission is sought for the carrying out of remedial works to approximately 0.44km of the installed underground cable ducting which is subject to a pending application for substitute consent to an bord pleanála (ref: abp-300811-18), remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following the completion of the civil works. The development will comprise part of an overall development in counties leitrim, sligo and roscommon, consisting of the laying of an underground 38 kv electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted derrysallagh wind farm, co sligo (sligo county council planning reference: pl 12/133) to the national electricity grid via the existing garvagh 110kv substation in the townland of seltan, co leitrim. Part of this development is in place and subject to a pending application for substitute consent to an bord pleanala (ref: abp-300811-18). This application is accompanied by an environmental impact assessment report (eiar)/environmental impact statement (eis).

Key dates

Timeline

  1. Application received14 March 2018
  2. Decision due8 May 2018
  3. Decision issued8 May 2018
  4. Appeal submitted5 June 2018
  5. Appeal decided15 March 2019
  6. Permission expiry14 March 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.