Groody Student Park, Castletroy, Co. Limerick.
Construction of a two-storey building containing four student apartments.
171141 · Limerick County Council · Lodged 7 December 2017
- Reference
- 171141
- Authority
- Limerick County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 7 December 2017
Summary
AI-generatedPermission is sought for a two-storey building at Groody Student Park. The building will contain four student apartments in total, with two units on each floor, sharing a common entrance and stairs.
- Residential units
- 4
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The construction of a two storey building consisting of 2 no. Student apartments on each of the two floors with common entrance area, stairs etc. , a connection to the existing foul and surface water sewers and all other associated site works
Built & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 24 Groody Student Park, Castletroy, Limerick | Jul 2025 | €435,000 | 22 m |
| 48 Brú Na GruadáN, Castletroy, Limerick | Mar 2026 | €240,000 | 40 m |
| 49 Bru Na Gruadan, Castletroy, Limerick | Jun 2026 | €255,000 | 40 m |
| Apt 84, Groody Student Park, Castletroy | Jan 2025 | €395,500 | 50 m |
| 35 The Hills, Bru Na Gruadan, Castletroyprice excludes VAT | Jan 2025 | €297,357 | 92 m |
| Apartment 12, The Hill, Bru Na Gruadanprice excludes VAT | Jan 2025 | €295,154 | 92 m |
| No 9 The Hill, Bru Na Gruadan, Castletroyprice excludes VAT | Feb 2025 | €281,938 | 92 m |
| 10 The Hill, Bru Na Gruadan, Castletroyprice excludes VAT | Jan 2025 | €295,154 | 92 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received7 December 2017
- Further information requested8 February 2018
- Further information received15 February 2018
- Decision due14 March 2018
- Decision issued14 March 2018
- Grant issued17 April 2018
- Permission expiry16 April 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
The construction of 6 No. student accommodation, duplex type units over three floors, connections to mains…
Groody Student Park , Castletroy , Co. Limerick
2460178LimerickLodged 1 Mar 2024Apartments
- Refused60 m away
Construction of two semi detached three storey dwellings, boundary wall and all associated site works
159 Curragh Birin , Castletroy , Co. Limerick.
1877LimerickLodged 31 Jan 2018New dwelling
- Granted70 m away
Change of use of existing vacant commercial unit to residential(apartment) at ground floor level of existing…
The Courtyard , Bru na Gruadan , Castletroy Limerick
21352LimerickLodged 23 Mar 2021Change of use
- Granted70 m away
The construction of a two storey dwelling, site entrance and all associated ancillary site development works
159 Curragh Birin , Castletroy , Co. Limerick.
19636LimerickLodged 28 Jun 2019New dwelling
- Granted80 m away
The construction of a two-storey extension to the side and rear of an existing dwelling, and all ancillary…
159 Curragh Birin , Castletroy , Limerick
221106LimerickLodged 14 Oct 2022Extension
- Granted80 m away
The construction of a two-storey extension to the side and rear of an existing dwelling, and all ancillary…
158 Curragh Birin , Castletroy , Limerick
221105LimerickLodged 14 Oct 2022Extension
- Granted110 m away
Extension to his dwelling house
156 Curragh Birin , Castletroy , Limerick
201176LimerickLodged 17 Nov 2020Extension
- Granted120 m away
The erection of illuminated signage to the existing western elevation
Troy Student Village , Groody , Newcastle Co. Limerick.
19110LimerickLodged 8 Feb 2019Commercial
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedApartments
The construction of 6 No. student accommodation, duplex type units over three floors, connections to mains…
Groody Student Park , Castletroy , Co. Limerick
2460178LimerickLodged 1 Mar 2024
- GrantedApartments
(1) CONSTRUCTION OF (A) A NEW BUILDING TO PROVIDE 32 NO. STUDENT APARTMENTS AND (B) ANCILLARY AND ASSOCIATED…
RAMELTON ROAD , LETTERKENNY , CO. DONEGAL
2461761DonegalLodged 4 Nov 2024
- GrantedApartments
The construction of 2 no. 2 bed apartments, public sewer connection, together with all other ancillary site…
Connolly Street, Fermoy TD, Fermoy, Co. Cork
214614corkLodged 10 Mar 2021
- GrantedApartments
ERECTION OF A TWO STOREY BUILDING CONSISTING OF TWO NO. TWO BEDROOM APARTMENTS, TOGETHER WITH CONNECTION TO…
FERRIS LANE , ARDARAVAN , BUNCRANA
2250676DonegalLodged 19 Apr 2022
- GrantedApartments
Demolition of 2 no. ruined dwellinghouses and construction of residential development of 23 no. student…
Rose Lodge, Loughbeg, Ringaskiddy,
0710337corkLodged 16 Aug 2007
- GrantedApartments
The construction of a two-storey terraced building, comprising of 2 no. two-bedroom apartments and 2 no.…
Knockaculleen , Dromore West , Co. Sligo
2660009SligoLodged 16 Jan 2026
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.