Planning Permission Ireland
GrantedAlterationsDecided 23 January 2019

Hawthorn House, National Technology Park, Castletroy Co. Limerick.

Alterations to a permitted four-storey office building, including a lobby extension and solar panels.

181139 · Limerick County Council · Lodged 23 November 2018

Reference
181139
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
23 November 2018

Summary

AI-generated

Proposed changes to a previously permitted office building include a 58 sqm single-storey lobby extension and a 200mm raise in parapet height. The plans also feature 110 sqm of rooftop solar panels, window modifications, and revised drainage.

Alterationsofficesolaralterations
Storeys
4
Floor area
58 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the previously permitted planning application ref. 14/900, a four storey office building. The proposed alterations include a 58 sqm single storey extension to the entrance lobby, a 200mm raise in parapet height, 110 sqm of photovoltaic solar panels on the roof, new windows to the north east elevation, relocation of previously permitted bay window on the south east elevation and escape doors on the north east elevation (16 sqm), a revised surface water drainage design for the site and new walls/railings to the main vehicular entrance

Land-use zoning

What this land is zoned for

High Tech/Manufacturing CampusBP
To provide for office, research and development, high technology, regional distribution/ logistics, manufacturing and processing type employment in a high quality built and landscaped campus style environment.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
50 The Grebe, Newtown Avenue, Castletroyprice excludes VATJan 2025€271,696328 m
37 Newtown Avenue, Castletroy, Limerickprice excludes VATJan 2025€414,097328 m
44 Newtown Avenue, Castletroyprice excludes VATJan 2025€312,775328 m
68 Newtown Avenue, Castletroy, Limerickprice excludes VATMar 2025€350,660328 m
69 Newtown Avenue, Castletroyprice excludes VATMar 2025€350,661328 m
64 Newtown Avenue, Castletroy, Limerickprice excludes VATMar 2025€286,344328 m
71 Newtown Avenue, Castletroyprice excludes VATApr 2025€289,317328 m
65 Newtown Avenue, Castletroy, Limerickprice excludes VATApr 2025€325,991328 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 November 2018
  2. Decision due26 January 2019
  3. Decision issued23 January 2019
  4. Grant issued26 February 2019
  5. Permission expiry9 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.