"Sruth Lan", South Circular Road, Limerick.
Construction of a new vehicle entrance, including piers, gates, and driveway hardstanding.
18275 · Limerick County Council · Lodged 23 March 2018
- Reference
- 18275
- Authority
- Limerick County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 23 March 2018
Summary
AI-generatedThe application seeks permission for a new vehicle entrance at the property. This will include the installation of piers, gates, driveway hardstanding, and all ancillary site works.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Construction of a new vehicle entrance, including piers, gates, driveway hardstanding and all ancillary site works
Land-use zoning
What this land is zoned for
“To provide for residential development, protect and improve existing residential amenity.”
Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Inisfree, South Circular Rd, Limerick | Jun 2025 | €700,000 | 39 m |
| 8a Fitzhaven Sq, South Circular Rd, Limerick City | May 2026 | €310,000 | 119 m |
| 4 Fitzhaven Square, Co Limerick | Oct 2025 | €365,000 | 128 m |
| 4a Fitzhaven Sq, Circular Rd South, Limerick | Mar 2025 | €247,500 | 128 m |
| 11 Fitzhaven Square, Co Limerick | Jun 2025 | €341,000 | 131 m |
| 5 Mount Prospect Terrace, South Circular Rd, Limerick | Feb 2025 | €367,000 | 148 m |
| 1 Mount Park, New St, Limerick | Apr 2026 | €475,000 | 184 m |
| 1 Oakville Terrace, New St, Limerick | Feb 2025 | €570,000 | 190 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received23 March 2018
- Decision due17 May 2018
- Decision issued16 May 2018
- Grant issued20 June 2018
- Permission expiry19 June 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Construction of a first floor bathroom extension to the rear of the existing dwellinghouse and permission to…
Loretto , South Circular Road , Limerick
21733LimerickLodged 27 May 2021Extension
- Granted40 m away
The demolition of the 2-storey extension to the rear of the original dwelling, the construction of a new…
Inisfree , South Circular Road , Limerick
2560835LimerickLodged 22 Aug 2025Extension
- Granted40 m away
The widening of the existing shared driveway vehicular entrance, including new pier, gate, driveway…
"Dun Mhuire" , South Circular Road , Limerick
23281LimerickLodged 31 May 2023Alterations
- Awaiting decision60 m away
The demolition of detached garage and outbuilding to rear of dwelling and planning permission for the…
Willowdale , South Circular Road , Limerick
2660684LimerickLodged 19 Jun 2026
- Granted70 m away
Alterations to the internal layout on the Third Floor of the building including demolition of existing…
Mary Immaculate College , Foundation Building , South Circular Road
16182LimerickLodged 7 Mar 2016Alterations
- Granted80 m away
The construction of a new single storey extension of 607sqm; incorporating a special educational needs unit…
Scoil Mháthair Dé , South Circular Road , Limerick City.
2460655LimerickLodged 1 Jul 2024Extension
- Granted90 m away
Change of use of part of play yard from play yard to staff car parking and removal of planters and increased…
Scoil Mháthair Dé , South Circular Road , Limerick
21519LimerickLodged 22 Apr 2021Retention
- Granted90 m away
2 no. ground floor extensions to the dwelling house — dining room to the rear of the house and
3 Ullard , Ashbourne Avenue , Limerick.
191182LimerickLodged 29 Nov 2019Retention
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedAlterations
A new vehicle entrance with gates and all associated site works
Rosbeg , Summerville Avenue , South Circular Road Limerick.
2645LimerickLodged 25 Feb 2026
- Awaiting decisionAlterations
Provision of a new vehicular entrance & driveway and associated site works
10, Churchtown Avenue, Rathmines Great, Dublin 14, D14YE84
D26A/0309Dún Laoghaire–RathdownLodged 23 Apr 2026
- GrantedAlterations
New vehicular entrance, hard surface driveway and ancillary site works
22 Pinewood, Elm Park, Sarsfield Road, Doughcloyne, Co. Cork
174985corkLodged 24 Apr 2017
- GrantedInfrastructure
The construction of a vehicular entrance, new driveway and all associated site development works
5 Connolly Park , Clonmel , Co. Tipperary
2560203TipperaryLodged 13 Mar 2025
- GrantedInfrastructure
The construction of a new vehicular entrance along with all associated site works
22 Georges Street , Portlaw , Co. Waterford.
2660211WaterfordLodged 2 Apr 2026
- Awaiting decisionInfrastructure
Construction of new vehicular entrance, piers, boundary treatments and associated landscaping and ancillary…
Ballyshoneen, Waterfall, ,
094436corkLodged 13 Feb 2009
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.