Planning Permission Ireland
GrantedHousing estateDecided 12 December 2019

7A Greenhill Road, Limerick.

Construction of three two-storey terraced houses and associated parking on Greenhill Road.

198008 · Limerick County Council · Lodged 14 October 2019

Reference
198008
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
14 October 2019
Residential units
3
Floor area
245 m²

Summary

AI-generated

The development consists of three residential two-storey terraced units, comprising two 2-bedroom units and one 1-bedroom unit. It also includes three new on-street parallel parking spaces, footpath modifications, landscaping, and integration with an adjoining approved development.

Housing estateterraced housingresidentialparking
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(a) provision of 3 no. Residential two-storey terraced units comprising 2 no. 2 bedroom units and 1 no. 1 bedroom unit; (b) provision of new on-street parallel parking comprising 3 no. Spaces to greenhill road and modification of existing footpaths; (c) hard landscaping including; front privacy strip and bin stores to dwellings; (d) soft landscaping including planting and trees; (e) replacement of/remedial works to existing boundaries with adjacent properties; (f) provision of new water connections, a foul sewer connection, and a surface water drainage system; (g) works to integrate with previously approved part 8 planning submission on the adjoining site (ref: 18/8001); (h) all associated site works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
To provide for residential development, protect and improve existing residential amenity.

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Greenhills Rd, Garryowen, LimerickMay 2025€130,00038 m
38a Mulgrave Street, LimerickAug 2025€90,00052 m
58 St Laurence's Park, Garryowen, LimerickFeb 2025€250,00060 m
57 St Laurence's Park, LimerickJun 2025€160,00062 m
57 St Laurence's Park, LimerickFeb 2026€300,00062 m
15 Pike Ave, Garryowen, LimerickMar 2026€50,00076 m
8 St Dympnas Terrace, Mulgrave Street, LimerickOct 2025€290,00079 m
18 Greenhills Road, Garryowen, LimerickNov 2025€232,500110 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 October 2019
  2. Decision due8 December 2019
  3. Decision issued12 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.