Planning Permission Ireland
GrantedInfrastructureDecided 25 November 2022

Knockanerry, Murroe, Co. Limerick

Upgrades to wastewater infrastructure in Murroe, including a new storm water tank and sludge drying reed beds.

221067 · Limerick County Council · Lodged 3 October 2022

Reference
221067
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
3 October 2022

Summary

AI-generated

The project involves constructing an inlet works, a storm water holding tank, a sludge pump station, a secondary settlement tank, and 1,080 square metres of sludge drying reed beds. It also includes the demolition of existing sludge drying beds and ancillary works. A Natura Impact Statement has been submitted.

Infrastructurewastewaterinfrastructureenvironmental
Floor area
1,080 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The construction of an inlet works; construction of a storm water holding tank complete with cleaning system; construction of a sludge pump station; construction of a secondary settlement tank; construction of 1,080m2 sludge drying reed beds; construction of washwater booster kiosk; construction of control kiosk; demolition of existing sludge drying beds and all ancillary site development works including hard and soft landscaping. A natura impact statement(nis) has been prepared and is submitted as part of the planning application

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Greenroad, Murroe, LimerickMar 2026€222,000236 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 October 2022
  2. Decision due27 November 2022
  3. Decision issued25 November 2022
  4. Grant issued3 January 2023
  5. Permission expiry2 January 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.