Planning Permission Ireland
GrantedCommercialDecided 10 October 2023

Maxol Service Station, St. Nessan's Road, Dooradoyle

Extension and alterations to a service station in Dooradoyle, including a new restaurant and EV charging hub.

221387 · Limerick County Council · Lodged 22 December 2022

Reference
221387
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
22 December 2022

Summary

AI-generated

The project involves a 142 sqm extension to the existing service station to accommodate a restaurant and additional seating. It also includes the construction of an EV charging hub with a canopy, solar panels, and a reconfiguration of the site layout and parking.

Commercialservice stationev chargingrestaurantsolar
Floor area
142 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the existing single story service station building (accommodating retail unit, ancillary off-licence, delis, public seating, storage, and office) consisting of the construction of a single storey extension of 142 sqm to provide for a restaurant (95 sq m) and additional seating (41 sq m) all resulting in a building of 548 sqm total gfa, and the provision of screened roof plant. Reconfiguration of the existing site layout including relocation of existing site exit and alteration of vehicular circulation; provision of 1 no. Hgv parking/delivery space, provision of cycle and motorbike parking; reconfiguration of car parking resulting in 17 no. Car parking spaces and 2 no. Service bays; construction of an ev charging hub (consisting of 6 no. Ev charging car parking spaces, a canopy, ancillary plant, signage, pv panels); construction of replacement waste/plant compound; removal of existing canopy link (155 sqm) and associated structure, and make good remaining canopy façade; relocation of existing solid fuel store, totem sign, vents and offset fill location; diversion of an existing stormwater pipe within the site boundary; alterations to boundaries; hard and soft landscaping, changes to levels and all site development works above and below ground. The proposed development seeks the provision of signs: 12 no. Illuminated signs (2 no. X 0.3 sq m; 2 no. X 1.4 sq m; 2.27 sq m; 2.5 sq m; 3.6 sq m; double sided sign 12.92 sq m total; 3 no. Illuminated signs mounted on the front elevation 2 no. X 0.33 sq m and 2.06 sq m; 1 no. Inside the building window 0.88 sq m); and 10 no. Signs (2 no. × 0.165 sq m; 0.29 sq m; 0.38 sq m; 6 no. X 1.39 sq m)

Land-use zoning

What this land is zoned for

Local CentreDC
To protect and provide local centre facilities to serve the needs of new/existing neighbourhoods and residential areas.

National zoning type: District, neighbourhood centre

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
4 Willsbrook, St Nessans Rd, DooradoyleJan 2026€300,00054 m
7 Belvoir Estate, High Meadows, GouldavoherMay 2025€370,00077 m
8 Oakvale Drive, Dooradoyle, LimerickMay 2025€390,00080 m
28 Oakvale Dr, Dooradoyle, LimerickFeb 2025€150,00084 m
22 Willsbrook, Dooradoyle, LimerickJun 2026€463,00086 m
2 Belvoir Lawn, Gouldavoher, LimerickJul 2025€315,000118 m
22 Oakvale Dr, Dooradoyle, LimerickJul 2025€333,000125 m
23 Oakvale Dr, Dooradoyle, LimerickApr 2025€630,000131 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 December 2022
  2. Further information requested22 February 2023
  3. Further information received14 September 2023
  4. Decision due11 October 2023
  5. Decision issued10 October 2023
  6. Grant issued14 November 2023
  7. Permission expiry13 November 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.