Adare Manor Hotel and Golf Resort, Adare, Co. Limerick
Installation of 226 solar panels on a machinery shed roof at Adare Manor.
22861 · Limerick County Council · Lodged 5 August 2022
- Reference
- 22861
- Authority
- Limerick County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 5 August 2022
Summary
AI-generatedThe application is for the erection of 226 additional solar photovoltaic panels on the roof of an existing machinery shed. The development is located within the curtilage of Adare Manor, which is a protected structure.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The erection of 226 no. Additional solar photovoltaic panels on the roof of the existing machinery shed and all associated site works. The proposed development is within the curtilage of adare manor estate. Adare manor is a protected structure rps 809
Land-use zoning
What this land is zoned for
“To provide for tourist facilities, which would improve the tourism opportunities.”
National zoning type: Tourism and related
Objective set by the Adare Local Area Plan 2024-2030 (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planPreviously zoned
- Special Control Area · 2015–2024 plan
Key dates
Timeline
- Application received5 August 2022
- Decision due29 September 2022
- Decision issued27 September 2022
- Grant issued2 November 2022
- Permission expiry1 November 2027
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
The erection of 190 Solar Photovoltaic panels on the roof of the existing machinery shed and all associated…
Adare Manor , Adare , Co. Limerick
20320LimerickLodged 16 Apr 2020Energy
- Granted50 m away
Construction of an ESB substation building at the facility complex
Adare Manor , Adare
16615LimerickLodged 8 Jul 2016Infrastructure
- Granted100 m away
Construction of a single storey office extension to existing facilities building, a new laundry storage and…
Adare Manor , Adare , Co. Limerick.
181212LimerickLodged 12 Dec 2018Commercial
- Granted110 m away
(a) demolition of existing un-occupied dwelling house adjacent to farmyard complex (b) change of use from…
Adare Manor , Adare
16616LimerickLodged 8 Jul 2016Change of use
- Granted260 m away
The construction of 10 no. detached 2-storey, 3-bedroom Self-Catering Accommodation Lodges; vehicular access…
Graigue Rathkeale Road , Adare , County Limerick
2560977LimerickLodged 26 Sept 2025Commercial
- Granted320 m away
New enclosure and flood lighting to 4no. tennis courts, practice court and 2no. ball-walls, the reorientation…
The Manor Fields , Adare , Co. Limerick
21200LimerickLodged 23 Feb 2021Infrastructure
- Granted340 m away
(a) removal of 20th century single storey extension to the rear of Boulabally House, (b) fabric repairs to…
Boulabally House , Adare Manor , Adare
16618LimerickLodged 8 Jul 2016Alterations
- Granted370 m away
Modifications of development previously granted permission under Pl. Ref. 17/713 for the Pavilion Building…
The Manor Fields , Adare , Co. Limerick
21460LimerickLodged 9 Apr 2021Alterations
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The erection of 190 Solar Photovoltaic panels on the roof of the existing machinery shed and all associated…
Adare Manor , Adare , Co. Limerick
20320LimerickLodged 16 Apr 2020
- GrantedAlterations
Proposed development to consist of the installation of 17 No. Solar PV Panels on the South, East and West…
10, De Vesci Terrace, Dun Laoghaire, Dublin, A96PW02 (A Protected Structure)
D26A/0169/WEBDún Laoghaire–RathdownLodged 2 Mar 2026
- Awaiting decisionEnergy
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an…
Shelton Abbey Open Prison , Arklow , Co. Wicklow
2360416WicklowLodged 16 Nov 2023
- GrantedEnergy
The erection of 10,634.64m2 or 1.27 MWp of photovoltaic panels on lands located southwest of our golf course,…
Adare Manor Hotel and Golf Resort , Adare Manor Adare , Co. Limerick
2460189LimerickLodged 5 Mar 2024
- GrantedEnergy
Permission for development which will consist of the erection of solar panels on the roof of Aras na MacLeinn…
Aras na MacLeinn Building , NUIG Campus , University Road
22172Galway CityLodged 17 Jun 2022
- GrantedEnergy
Array of solar photovoltaics on south east roof of shed (there is a protected structure within the curtilage…
Donard Demesne West , Donard , Co. Wicklow
181400WicklowLodged 14 Dec 2018
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.