Planning Permission Ireland
GrantedApartmentsDecided 25 September 2025

Groody Road, Newcastle Castletroy, Limerick

Large-scale student accommodation development of 1,400 bedspaces in Castletroy.

2560113 · Limerick County Council · Lodged 12 February 2025

Reference
2560113
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
12 February 2025
Residential units
5
Floor area
34257.4 m²

Summary

AI-generated

This Large-Scale Residential Development (LRD) application proposes a purpose-built student accommodation scheme. It consists of 196 bed clusters providing 1,400 bedspaces across 5 blocks ranging from 5 to 8 storeys, including student amenities like a gym, library, and canteen.

Apartmentsstudent housinglrdhigh rise
Storeys
8

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • A large-scale residential development (lrd) - development of a purpose-built student accommodation (pbsa) scheme on land fronting the groody road and dublin road, castletroy, in the townland of newcastle, limerick for a period of seven years. The development consisting of 196 no. Bed clusters, is distributed across 5 no. Separate blocks, ranging in height from 5
  • 8 storeys, with a total of 1,400 no. Student bedspaces to be delivered in two phases of development including: (i) block a comprising 8 storeys providing for (a) 28 no. Bed clusters and 224 no. Bedspaces; (b) student library; (c) student union; (d) plant room; (e) bin store; (f) bicycle store; (ii) block b comprising 7 storeys providing for (a) 52 no. Bed clusters and 400 no. Bedspaces; (b) reception & office; (c) post room; (d) laundry room; (e) student canteen; (f) maintenance store; (g) plant room; (h) esb sub station & switch room; (i) bin storage; (j) and bicycle store; (iii) block c comprising 6 storeys providing for (a) 51 no. Bed clusters and 355 no. Bedspaces; (b) student gym; (c) maintenance store; (d) plant room; (e) esb sub station & switch room; (f) bin storage; (g) and bicycle store; (iv) block d comprising 6 storeys providing for (a) 32 no. Bed clusters and 211 no. Bedspaces; (b) reception & office; (c) post room; (d) laundry room; (e) student canteen; (f) student supply retail unit (60m2); (g) plant room; (h) maintenance store; (i) bin storage; and (k) bicycle storage; (v) block e comprising 5 storeys providing for (a) 33 no. Bed clusters and 210 no. Bedspaces; (b) reception & office; (c) laundry room; (d) maintenance store; (e) bicycle store; and (f) plant room; and (vi) ancillary site development works including car and bicycle parking provision; boundary treatments; roof plant; public lighting; water supply; foul and surface water drainage infrastructure; signage; and a temporary construction access to facilitate phase
  • Vehicular access to the site will be from the groody road with pedestrian access to the dublin road. Extensive landscaping proposals, including (a) landscaped courtyards; (b) pedestrian and cycle connections from the groody road to the groody green wedge; (c) natural landscaping and public walkways within the groody green wedge; and (d) a wetland area adjacent to the groody river are also proposed. Planning permission is also sought for use of the accommodation, outside of student term time, for short-term letting purposes. The planning application is

Land-use zoning

What this land is zoned for

New ResidentialR1
To provide for new residential development in tandem with the provision of social and physical infrastructure.

National zoning type: New/proposed residential

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
165 Curragh Birin, Castletroy, LimerickAug 2025€296,00090 m
29 Curragh Birin, Castletroy, LimerickDec 2025€313,000151 m
Apt 84, Groody Student Park, CastletroyJan 2025€395,500240 m
24 Groody Student Park, Castletroy, LimerickJul 2025€435,000304 m
48 Brú Na GruadáN, Castletroy, LimerickMar 2026€240,000322 m
49 Bru Na Gruadan, Castletroy, LimerickJun 2026€255,000322 m
14 Halcyon Place, The Park, CastletroyJun 2025€250,000358 m
93 Curragh Birin, Castletroy, LimerickSept 2025€356,000364 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 February 2025
  2. Further information requested7 April 2025
  3. Further information received11 August 2025
  4. Decision due5 October 2025
  5. Decision issued25 September 2025
  6. Grant issued29 October 2025
  7. Permission expiry28 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.