GrantedEnergyDecided 23 September 2025

O'Halloran Rd, National Technological Park, Castletroy Limerick

Installation of a 1MW solar farm on a 1.8-hectare greenfield site at the National Technology Park in Castletroy.

2560332 · Limerick County Council · Lodged 16 April 2025

Reference
2560332
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
16 April 2025

Summary

AI-generated

The development will consist of ground-level metal PV frames, an electrical equipment enclosure, a gravel access road, and perimeter fencing. It also includes revisions to the existing car park and underground service trenches on the 2.7-hectare campus.

Energysolargreen energyindustrial
Floor area
18,290 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The installation of a solar photovoltaic (pv) farm 1mwp (1megawatt peak) system (1.829 hectare in size) on the existing greenfield area on the north west side of their existing 2.7 hectare campus at o’halloran road, national technology park, castletroy, co. Limerick, ireland, the solar farm will consist of metal pv frames at ground level, an electrical equipment enclosure, hardcore gravel access roadway, perimeter fencing to match local park finishes, making good to existing landscaping, revisions to existing carpark, underground service trenches, and associated site works. This application relates to development, which comprises an activity, which holds an industrial emissions directive licence (reg. No. P0973-01)

Land-use zoning

What this land is zoned for

High Tech/Manufacturing CampusBP
To provide for office, research and development, high technology, regional distribution/ logistics, manufacturing and processing type employment in a high quality built and landscaped campus style environment.

National zoning type: Mixed/general commercial/industrial/enterprise uses

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received16 April 2025
  2. Further information requested9 June 2025
  3. Further information received31 July 2025
  4. Decision due24 September 2025
  5. Decision issued23 September 2025
  6. Grant issued28 October 2025
  7. Permission expiry27 October 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.