Planning Permission Ireland
GrantedExtensionDecided 17 December 2025

No. 2 St Peter and Paul’s Terrace, Crawford Street, Bruff Co. Limerick

Refurbishment and extension of a house in Bruff, including demolition of an existing rear extension and shed.

2561076 · Limerick County Council · Lodged 27 October 2025

Reference
2561076
Authority
Limerick County Council
Register status
Decided
Type
PERMISSION
Received
27 October 2025

Summary

AI-generated

The project involves refurbishing and extending an existing dwelling, which includes demolishing a single-storey rear extension and part of a shared shed. A new single-storey extension with a link structure will be built, alongside retention permission for a vehicular entrance.

Extensionextensiondemolitionretention
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Refurbishing and extending the existing dwelling at no. 2, st peter and paul’s terrace, crawford’s street, bruff, co. Limerick v35 dp22. This development will include the following (1) demolition of an existing single storey extension at the rear of the existing dwelling (2) demolition of part of an existing shared shed structure at the rear of the existing dwelling (3) construction of a new single storey extension to the original dwelling including a link structure between the proposed extension and the existing dwelling (4) new openings and alterations to existing rear façade, (5) retention permission for a new vehicular site entrance, driveway and front boundary alterations, including all related site ancillary works

Land-use zoning

What this land is zoned for

Existing ResidentialRS
To provide for residential development, protect and improve existing residential amenity.

Objective set by the Limerick Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Main Street, Bruff, Co LimerickJan 2026€140,000137 m
Main St, Bruff, LimerickApr 2026€115,000145 m
Ballyhadeen, Bruff, County Limericknot full market priceMar 2025€15,000146 m
1 Church Street, Bruff, Limerickprice excludes VATApr 2025€283,700146 m
Main St, Bruff, Co LimerickNov 2025€190,000166 m
Main Street, Bruff, Co LimerickJul 2025€250,000183 m
Apt First Floor, 90 91 Main St, BruffJan 2026€145,000190 m
3 The Grove, Bruff, LimerickAug 2025€330,000205 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 October 2025
  2. Decision due21 December 2025
  3. Decision issued17 December 2025
  4. Grant issued27 January 2026
  5. Permission expiry26 January 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.