Lissanore, Co.Longford
Construction of a 149-metre-tall wind turbine and substation in Lissanore.
2360010 · Longford County Council · Lodged 19 April 2023
- Reference
- 2360010
- Authority
- Longford County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 19 April 2023
Summary
AI-generatedThe project involves constructing one Enercon E138 Wind Energy Converter on an 81m tower with a 4.2MW rating and a tip height of 149.38m. It includes a hardstanding area, underground cabling, a 55 sq.m single-storey substation building, and an internal access track.
- Storey
- 1
- Floor area
- 55 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The construction of one enercon e138 wind energy converter on an 81m tower with an electrical rating of 4.2mw and an overall tip height of 149.38m. Installation of the hardstanding area for the wind energy converter. Installation of underground circuit cables which will run in underground cable trenches (c. 1.2m deep), from the proposed wind energy converter to the proposed substation building on the site. Construction of the proposed substation building which will be located c. 98m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m2 and c. 4.8m in height. Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the wind energy converter hardstanding area. All associated ancillary infrastructure and preparatory works such as provision of the site entrance
Key dates
Timeline
- Application received19 April 2023
- Decision due13 June 2023
- Decision issued8 June 2023
- Appeal submitted29 June 2023
- Appeal decided20 June 2024
- Permission expiry19 June 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Awaiting decisionAt this site
RED III Application for a 10-year planning permission with a total site area of 3.13 hectares. The…
Lissanore , Co. Longford
2660181LongfordLodged 9 Jun 2026Energy
- Awaiting decisionAt this site
The construction of one Enercon 138 wind turbine on an 81m tower with electrical rating of 4.2MW and an…
Lissanore , Co Longford
2245LongfordLodged 3 Mar 2022Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- Awaiting decisionEnergy
The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW…
Rin , Ferbane , County Offaly
2460276OffalyLodged 23 Jul 2024
- Awaiting decisionEnergy
The construction of one Enercon 138 wind turbine on an 81m tower with electrical rating of 4.2MW and an…
Lissanore , Co Longford
2245LongfordLodged 3 Mar 2022
- Awaiting decisionEnergy
Permission for development relating to the — The construction of one Enercon E138 Wind Turbine on an 81m…
Kilcash , Roscommon , Roscommon
2360056RoscommonLodged 17 Aug 2023
- Awaiting decisionEnergy
Permission for the proposed Project relating to — The construction of one Enercon E138 Wind Turbine on an 81m…
Kilcash , Roscommon , Roscommon
2360110RoscommonLodged 15 Sept 2023
- GrantedEnergy
Permission for a development relating to the — The construction of one Enercon E138 Wind Turbine on an 81m…
Kilcash , Roscommon , Co. Roscomnon.
2360142RoscommonLodged 29 Sept 2023
- GrantedEnergy
For — The construction of one Enercon 115 wind turbine on a 92m tower with an electrical rating of 4.2MW and…
Tullyhaw , Snugborough , Co Cavan
22137CavanLodged 8 Apr 2022
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.