Planning Permission Ireland
Awaiting decisionEnergyDecision due in 11 days (3 August 2026)

Lissanore, Co. Longford

Construction of a 169-metre wind turbine and associated substation modules in Lissanore.

2660181 · Longford County Council · Lodged 9 June 2026

Reference
2660181
Authority
Longford County Council
Register status
In progress
Type
PERMISSION
Received
9 June 2026

Summary

AI-generated

This application seeks a 10-year planning permission for a wind energy development on a 3.13-hectare site. It includes the construction of one Enercon wind turbine with a 99m tower, a 169m tip height, and a 4.5MW rating. It also proposes a modular substation design and associated access tracks.

Energywind energyturbineinfrastructure
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Red iii application for a 10-year planning permission with a total site area of 3.13 hectares. The development, an amendment to the previously granted development ref: 2360010 will consist of
  • The construction of one enercon e138 wind energy converter on an 99m tower with an electrical rating of 4.5mw and an overall tip height of 169m
  • An amendment to substation design, changing from a block-built to a modular design comprising of 2 single-story prefabricated modules surrounded by stock proof fencing; an esb module measuring 14.33 m² and height of 3.41m and; an ipp module measuring 33.31 m² and 3.89m in height; and
  • All associated ancillary works including, access tracks, drainage electrical ducting and reinstatement works. The operational lifespan of the development will be 35 years from the date of commercial operation. This planning application is not subject to a natura impact statement (nis) or environmental impact assessment report (eiar). This development is covered by the provisions of the renewable energy directive iii (directive (eu) 2023/2413) and it is important to note that the planning application may be subject to section 34d of the planning and development act 2000, as amended. When a notice issues in accordance with section 34d(b), the provisions of article 26a of the planning and development regulations 2001 to 2025 shall apply

Key dates

Timeline

  1. Application received9 June 2026
  2. Decision due3 August 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.