Planning Permission Ireland
GrantedInfrastructureDecided 28 October 2025

Ballymahon (Townland), Co. Longford

A 10-year planning permission for major upgrades and extensions to the Ballymahon Wastewater Treatment Plant.

2560086 · Longford County Council · Lodged 9 May 2025

Reference
2560086
Authority
Longford County Council
Register status
Decided
Type
PERMISSION
Received
9 May 2025

Summary

AI-generated

The application seeks a 10-year permission for extensive upgrade works and an extension to the Ballymahon Wastewater Treatment Plant and local network. Works include refurbishing existing tanks, constructing new inlet works, biological process units, settlement tanks, a new gravity sewer, and a treated effluent outfall headwall to the River Inny.

Infrastructurewastewaterinfrastructureutility

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

10-year planning permission for proposed upgrade works and extension to the ballymahon wastewater treatment plant (wwtp) and local wastewater network. The proposed development comprises: (1) the refurbishment of existing final settlement tank, storm water tank, return-activated sludge (ras) and waste-activated sludge (was) pumping station and 2 no. Existing aeration tanks within the existing wwtp site; (2) an extension to the wwtp to include new inlet works with duty / standby combined screens and grit plant, odour control system, high-level emergency overflow chamber, flow to full treatment (fft) storm pumping station, stormwater storage tank, biological process units including 1 no. Selector tank, 2 no. Anoxic tanks, and 2 no. Aeration tanks, 2 no. Final settlement tanks with flow split chamber; (3) a new section of gravity sewer from the network pumping station serving auburn village residential estate to the new inlet works; (4) a new ras / was pumping station with sludge holding capacity; sludge drying reedbeds (8 no. Cells), return liquors pumping station, washwater pumping station, new chemical dosing plant, treated effluent outfall headwall to river inny; (5) alterations to the existing entrance and a new internal road connecting the existing internal access road to the extension area; (6) surface water drainage interceptor, manholes and surface water attenuation tank; (7) esb sub-station building, permanent generator and fuel tank, solar panels on block mounted frames; (8) decommissioning of picket fence thickener and associated dewatering equipment, ferric dosing tank, final effluent outfall chamber, complete with automatic sampler, and a redundant section of existing sewer network in the auburn village residential estate (all to remain in situ post decommissioning); (9) the decommissioning / removal of the existing inlet works and grit removal chamber; (10) decommissioning / demolition of pumping station in the auburn village residential estate; (11) site lighting (both task lighting and road lighting), boundary fencing and treatments including landscaping; (12) below ground interconnecting pipework; (13) and all ancillary site development and site excavation works above and below ground for the above referenced development. A natura impact statement (nis) has been prepared and will be submitted to the planning authority with the application

Land-use zoning

What this land is zoned for

Social/Community/Education/Public UtilityCI
To primarily provide for educational, health, social, cultural, religious and community facilities.

National zoning type: Mixed/general community services/facilities uses

Objective set by the LONGFORD COUNTY DEVELOPMENT PLAN 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
5 Auburn Village, Ballymahon, LongfordFeb 2026€262,000117 m
14 Auburn Village, Ballymahon, LongfordJul 2025€245,000182 m
Apt 3, The Mill, RivercourtAug 2025€140,000265 m
20 The Granary, BallymahonAug 2025€148,000309 m
The Hill, Ballymahon, Co LongfordMar 2025€300,000315 m
6 Goldsmith Terrace, Ballymahon, Co LongfordDec 2025€198,000356 m
32 Thomond Court, Ballymahon, LongfordJan 2025€162,000398 m
34 Thomand Court, Ballymahon, Co LongfordJun 2026€178,000399 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 May 2025
  2. Further information requested17 June 2025
  3. Further information received15 September 2025
  4. Decision due9 November 2025
  5. Decision issued28 October 2025
  6. Grant issued1 December 2025
  7. Permission expiry30 November 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.