Planning Permission Ireland
GrantedHousing estateDecided 22 November 2020

Dublin Road, Haggardstown, Dundalk Co Louth

Strategic Housing Development of 257 residential units and a crèche in Haggardstown.

20696 · Louth County Council · Lodged 9 September 2020

Reference
20696
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
9 September 2020
Residential units
216
Floor area
237.6 m²

Summary

AI-generated

This is an SHD Stage 3 application for 257 residential units, comprising 163 houses and 94 apartments/duplexes. The development will also include a crèche, surface car parking, and electric vehicle charging points.

Housing estateshdcrecheapartmentshousing estate

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Shd stage 3 - application lodged with an bord pleanála (stage 2 ref. 20/69) for provision of a total of 257no. Residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) site excavation works to facilitate the proposed development to include excavation and general site preparation works along with removal of existing site compound. (b) the provision of a total of 163no. Residential dwellings which will consist of the following unit mix
  • 57no. 2 bed dwellings (house types 1, 1a, 1b)
  • 76no. 3bed semi detached dwellings (house types 2, 2a, 2b, 3
  • 5no. 3 bed terrace dwellings (terrace block
  • 13no. 4 bed semi detached dwellings (house type 6a)
  • 12no. 4 bed detached dwellings (house types 4 &
  • (c) the provision of a total of 94no. Apartments/duplex units consisting of 19no. 1 bed units, 38no. 2bed units and 37no. 3bed units; (d) provision of a creche; (e) provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche, duplexes and apartments; (f) provision of 4no. Electric vehicle charge points adjacent to the creche building with associated site infrastructure ducting to provide charge points for residents throughout the site; (g) provision of associated bicycle storage spaces with associated enclosures both at surface level throughout the site and bicycle storage facilities within apartment blocks 1 & 2; (h) use of existing access from dublin road with associated upgrade works to facilitate vehicular, pedestrian and cycle access to include provision of a right turning lane; (i) provision of a cycle path along dublin road; (j) provision of internal access roads and footpaths and associated connections to the existing earlsfort residential estate; (k) provision of residential communal open space areas (including formal play areas) including all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing; (l) provision of 2no. Esb substations; (m) internal site works and attenuation systems to include a hydrocarbon and silt interceptor on the storm network prior to discharge to the adjacent watercourse; (n) all ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water, gas and esb networks. Number of units reduced to 216 by an bord pleanala

Land-use zoning

What this land is zoned for

Existing ResidentialRS
To protect and enhance the amenity and character of existing residential communities.

National zoning type: Existing residential

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 21 March 2024.

Notified floor area: 91

12 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Rossmore, Earlsfort, Blackrockprice excludes VATJan 2026€418,50275 m
71 Adare, Earlsfort, Dundalkprice excludes VATNov 2025€392,069101 m
67 Adare, Earlsfort, Blackrockprice excludes VATMar 2025€343,612102 m
2 Rossmore, Earlsfort, Dundalkprice excludes VATDec 2025€359,029102 m
66 Adare, Earlsfort, Blackrockprice excludes VATMar 2025€341,410102 m
64 Adare, Earlsfort, Blackrockprice excludes VATFeb 2025€297,357105 m
12 Rossmore, Earlsfort, Blackrockprice excludes VATDec 2025€352,422106 m
1 Rossmore, Earlsfort, Seafield Roadprice excludes VATMay 2026€418,502107 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 September 2020
  2. Decision due30 December 2020
  3. Decision issued22 November 2020
  4. Grant issued23 December 2020
  5. Permission expiry22 December 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.