Planning Permission Ireland
Awaiting decisionRetention

Whiteriver, Dunleer, Co Louth

Retention of an as-built domestic garage, its temporary residential use, and associated site works.

22712 · Louth County Council · Lodged 8 September 2022

Reference
22712
Authority
Louth County Council
Register status
Invalid or incomplete
Type
RETENTION
Received
8 September 2022
Residential units
1
Floor area
152.5 m²

Summary

AI-generated

Retention permission is sought for an as-built domestic garage with alterations to its permitted footprint, layout, and location. The application also seeks to retain the temporary change of use of the garage to residential use, a hard stand area, and boundary extensions.

Retentiongarageresidentialretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention permission for
  • The domestic garage as built (permitted under file ref. 19/152) including alterations to the permitted elevations, footprint, internal layout and location of the garage
  • Retention of the temporary change of use of the garage to residential use
  • Retention of the hard stand area
  • Retention of the extension to the redline boundary as permitted under ref. 19/152 to facilitate the revised location of the domestic garage and hard stand area and all other associated site works

Key dates

Timeline

  1. Application received8 September 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.