Planning Permission Ireland
GrantedHousing estateDecided 25 November 2022

Newtown Wood, Newfoundwell Road, Newtownstalaban Drogheda

Replacing 80 permitted duplex apartments with 40 semi-detached and terraced houses in Drogheda.

22821 · Louth County Council · Lodged 18 October 2022

Reference
22821
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
18 October 2022
Residential units
40
Floor area
3792.4 m²

Summary

AI-generated

This Large-Scale Residential Development (LRD) application seeks to modify a permitted Strategic Housing Development. It proposes to replace 80 previously approved duplex apartments with 40 two-storey semi-detached and terraced houses, while keeping other site layouts as permitted.

Housing estatelrdhousing estatemodification
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Lrd application - permission for a large-scale residential development to modify a permitted shd, ref. No. Abp-305819-19, for replacement of 80 no. Duplex apartments (40 no. Duplex units) with 40 no. Semi-detached and terraced two storey dwellings, associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under abp-305819-19. This application may be inspected at the applicants website, www. Newtownstalabanlrd1. Com

Land-use zoning

What this land is zoned for

New Residential Phase 1R1
To provide for new residential neighbourhoods and supporting community facilities.

National zoning type: New/proposed residential

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
57 Newtown Wood, Termonfeckin Road, DroghedaApr 2025€429,000196 m
25 Newtown Wood, Termonfeckin Road, DroghedaJul 2026€415,000255 m
6 Beaulieu Banks, Termonfeckin Road, Droghedaprice excludes VATSept 2025€348,017396 m
7 Beaulieu Banks, Termonfeckin Road, Droghedaprice excludes VATSept 2025€348,018400 m
9 Beaulieu Banks, Termonfeckin Road, Droghedaprice excludes VATSept 2025€392,070409 m
10 Beaulieu Banks, Termonfeckin Road, Droghedaprice excludes VATSept 2025€392,070414 m
11 Bealieu Banks, Termonfeckin Road, Droghedaprice excludes VATSept 2025€400,881425 m
12 Beaulieu Banks, Termonfeckin Road, Droghedaprice excludes VATOct 2025€400,881428 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 October 2022
  2. Decision due12 December 2022
  3. Decision issued25 November 2022
  4. Grant issued4 January 2023
  5. Permission expiry29 March 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.