Construction of a hot-dip galvanising facility processing up to 36,000 tonnes of steel per year.

2360105 · Louth County Council · Lodged 15 May 2023

Reference
2360105
Authority
Louth County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
15 May 2023

Summary

AI-generated

Hibernia Steel (Manufacturing) Limited is seeking permission to construct and operate a hot-dip galvanising facility in Mell, Drogheda. The proposal includes a main building of approximately 5,719 sqm, four roof stacks, an ESB sub-station, LPG storage tanks, a double weighbridge, and a two-storey office building.

Industrialindustrialsteelfactoryemployment
Floor area
6,017 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Hibernia steel (manufacturing) limited are preparing a planning application to construct and operate a hot-dip galvanising facility. It is planned to process up to 36,000tpa of steel at the facility. In summary the proposal includes
  • Construction of a main building with an approximate gross floor area of 5719m2. The building is divided into three main sections in-take/out-take section at the southern end of the building. This is single storey and has a maximum height above finished ground floor level of 14.55m
  • Processing & services area at the northern end of the building. This is also single storey with maximum height above finished ground levels of 17.30m. The processing area is the area where the steel is pre-treated and galvanised
  • Construction of 4 no. Stacks on roof of building. These will be located on the roof at a height of 20 m above finished floor level (or 63 m aod)
  • Construction of esb sub-station within the main building
  • Installation of 2 no. Lpg storage tanks
  • Installation of double weighbridge
  • Construction of office building (2 storeys) with an approximate gross floor area of 298m2
  • Provision of trailer and truck parking spaces
  • Provision of 110 no. Visitor and staff parking areas, 2 of which are wheelchair accessible and 7 of which are ev charging locations
  • Provision of 20 no. Staff and visitor bicycle parking
  • Provision of concrete yard and additional hardcore yard
  • Installation of stormwater management system
  • Installation of 2 no. Rainwater harvesting tanks
  • Construction of soil berm
  • Landscaping works
  • Firewater retention infrastructure
  • Provision of vehicular and pedestrian entrance to the facility, site security fencing and entrance walls and gates. A number of sensitive receptors have been identified within 1km of the site . Including two residences located on the western boundary of the proposed site. There are no protected structures or natura 2000 sites within the site boundary

Land-use zoning

What this land is zoned for

General EmploymentSI
To provide for general enterprise and employment generating activities.

National zoning type: Industrial, enterprise, employment

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received15 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.