Planning Permission Ireland
GrantedInfrastructureDecided 17 November 2023

Tallanstown Wastewater Treatment Plant, Tallanstown, Co. louth

Upgrades to welfare facilities at Tallanstown Wastewater Treatment Plant.

2360382 · Louth County Council · Lodged 2 October 2023

Reference
2360382
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
2 October 2023

Summary

AI-generated

The development will consist of a new prefabricated steel container measuring 10ft by 10ft to house toilet and shower facilities. It includes a reinforced concrete base, utility connections, and associated site works.

Infrastructureutilitywwtpwelfare
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for proposed welfare facilities upgrades at tallanstown wastewater treatment plant (wwtp). The application is made under section 34 of the planning and development regulations 2000 (as amended). The proposed development will consist of
  • 1 no. Prefabricated steel container measuring 10ft (3.048m) in length x 10ft (3.048m) x 2.7m in height. The unit will be fitted out with welfare facilities including toilet and shower
  • The unit will be installed on a reinforced concrete base complete with perimeter footpaths
  • 2 no. 100mm ducts will be installed between the new unit and the existing structure to allow connection of water and electrical services
  • 150mm wastewater connection from the new unit to a nearby manhole
  • All associated ancillary site development works above and below ground

Land-use zoning

What this land is zoned for

Public Infrastructure and UtilitiesTU
To provide for transport infrastructure and public utilities.

National zoning type: Other networks and basic infrastructure/utilities uses

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 November 2024.

Notified floor area: 7.1

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Glyde View, Tallanstown, DundalkMay 2025€305,000160 m
Tallanstown Village, Dundalk, LouthFeb 2025€101,000315 m
25 Tallansfield Manor, Tallanstown, LouthMay 2026€430,000434 m
8 Glyde View, Tallanstown, Co. Louthnot full market priceMay 2026€171,000494 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 October 2023
  2. Decision due26 November 2023
  3. Decision issued17 November 2023
  4. Grant issued18 December 2023
  5. Permission expiry17 December 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.