Planning Permission Ireland
GrantedIndustrialDecided 25 November 2024

WuXi Biologics Ireland Limited, Dundalk Science and Technology Park in the townland of Haynestown, Mullagharlin Dundalk Co. Louth

Construction of a new Effluent Balancing and Resource Recovery Plant at the WuXi Biologics facility.

2460213 · Louth County Council · Lodged 19 April 2024

Reference
2460213
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
19 April 2024

Summary

AI-generated

The development on a 7.888-hectare site includes 3 covered structures with 12 process tanks, 5 storage tanks, a sludge dewatering facility, and a single-storey administration building with solar panels. It also features a new access bridge and pipe structures to link with the existing biopharmaceuticals plant.

Industrialindustrialbiotechinfrastructuresolar
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the construction and operation of a new effluent balancing and resource recovery plant (ebrrp) on a site of 7.888hectares, which will consist of: (1) excavation of the site to facilitate the proposed development, and reuse of excavated material as a landscaped spoil heap within the site; (2) construction of 3no. Covered structures containing 12no. Process tanks, located within concrete bunds with metal stairwells and platforms for access, and connected to an odour treatment facility. (3) installation of 5no. Covered storage tanks located within concrete bunds with metal stairwells and platforms for access. (4) installation of a sludge dewatering facility. (5) construction of a single-storey administration and process building with roof-mounted solar panels and rainwater harvesting tank. (6) widening of an existing access on the mullagharlin road and associated setback of the existing hedgerow, to facilitate a temporary construction access and a permanent operational access for small vehicles. (7) construction of a fabricated metal access bridge and pipe and cable support structures to link the proposed development with the existing biopharmaceuticals plant. (8) a temporary construction compound, to include double-stacked metal containers/cabins with access stairs, laydown areas, and 50no. Parking spaces; temporary internal road; and temporary internal construction haul road (including footpath). (9) all site development works, drainage, ancillary equipment, lighting, retaining walls, fencing, and landscaping works. The application relates to a development which comprises of an activity which holds an industrial emissions discharge (ied) licence (licence no. P1122-01). An environmental impact assessment report (eiar) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application

Land-use zoning

What this land is zoned for

Business and TechnologyCOE
To provide for office, research and development and high technology/high technology manufacturing type employment.

National zoning type: Office, business/technology park and related

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 St Furseys Park, Dublin Road, Haggardstownprice excludes VATFeb 2026€343,612353 m
9 Brookfield, Marlbog Road, HaggardstownOct 2025€740,000399 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 April 2024
  2. Further information requested4 June 2024
  3. Further information received4 October 2024
  4. Decision due28 November 2024
  5. Decision issued25 November 2024
  6. Grant issued10 December 2025
  7. Appeal submitted6 December 2024
  8. Permission expiry9 December 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.