Planning Permission Ireland
GrantedHousing estateDecided 19 September 2024

'Hearthfield' Headford Road, Mount Avenue Farndreg, Dundalk

Revisions to phases 2 and 3 of a housing development in Dundalk, adding two homes and altering layouts.

2460240 · Louth County Council · Lodged 1 May 2024

Reference
2460240
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
1 May 2024
Residential units
19
Floor area
2248.98 m²

Summary

AI-generated

The applicant is seeking amendments to a permitted housing development, affecting 19 dwellings. The changes will increase the phase 2 unit count from 47 to 49, reconfigure public open space, replace an attenuation tank with an over-ground basin, and relocate several permitted houses.

Housing estatehousing estateamendmentopen space

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for revisions to phases 2 and 3 of the permitted development at "hearthfield" only and affects 19 no. Dwellings. It also includes the re-positioning and configuration of public open space and revisions to drainage and boundary treatments. The amendments proposed as they affect the phase 2 permission (p. A. Ref. No. 20/210) affect permitted house no. ’s 95, 96, 120 and 121. The change in house type proposed will result in an increase in the number of dwellings within phase 2 from 47 to
  • It is also proposed to reposition and reconfigure the public open space area identified as ‘local green no. 4’ within phase 2 to the south of the permitted link road within phase 3 and replace attenuation tank with an over-ground detention basin within reconfigured public open space in phase
  • The position and alignment of the permitted link road is not affected by the revisions. The reconfiguration of the public open space will result in changes to the phase 3 layout as granted under p. A. Ref. No. 20/211 affecting permitted dwellings no’s 140
  • 154 located to the south of the permitted link road. It is proposed to replace these dwellings and locate them to the north of the permitted link road. The change in house types will result in a decrease in the number of dwellings permitted within phase 3 from 67 to
  • The proposed amendments however will not result in any change to the overall number of dwellings permitted within the overall “hearthfield” development as permitted under pa ref. No. 18/943 (abp ref. 303628-19); pa ref. No. 20/210 and pa ref. No. 20/211 i. E. 194. For details of proposed replacement dwellings please see full development description as contained in the public notices. The proposed development also provides for car parking, public open space, landscape and boundary treatments, including the construction of retaining walls, public lighting, surface water attenuation, in addition to all site development works including alterations to ground levels. *significant further information received on 28/08/2024 and revised notices received on 30/08/2024 which includes revisions to the permitted link road to provide a vehicular connection to residentially zoned lands to the south; a public lighting plan and additional information in relation to roads, drainage and structural engineering matters

Land-use zoning

What this land is zoned for

New Residential Phase 1R1
To provide for new residential neighbourhoods and supporting community facilities.

National zoning type: New/proposed residential

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
122 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€343,61224 m
121 Hearthfield, Mount Avenue, Dundalkprice excludes VATNov 2025€343,61229 m
120 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€343,61232 m
119 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€348,01741 m
118 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€343,61250 m
117 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€343,61259 m
129 Hearthfield, Mount Avenue, Dundalkprice excludes VATJan 2026€361,23367 m
128 Hearthfield, Mount Avenue, Dundalkprice excludes VATDec 2025€361,23472 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received1 May 2024
  2. Further information requested21 June 2024
  3. Further information received30 August 2024
  4. Decision due26 September 2024
  5. Decision issued19 September 2024
  6. Grant issued21 October 2024
  7. Permission expiry18 November 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.