Planning Permission Ireland
GrantedInfrastructureDecided 19 December 2024

Greenore Port and site of dwelling house on Shore Road (A91DD42), Greenore, Co. Louth

Construction of an offshore wind support base at Greenore Port including three buildings and marine works.

2460294 · Louth County Council · Lodged 28 May 2024

Reference
2460294
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
28 May 2024

Summary

AI-generated

A 10-year permission is sought for an Operation and Maintenance facility to support future offshore wind arrays in the Irish Sea. The development includes three standalone buildings with warehouses and offices, rooftop solar panels, dredging works, a new quay wall, and an access ramp.

Infrastructurewindportsolarmarine
Storeys
3
Floor area
5,010 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for a 10-year permission development at greenore port and site of dwelling house on shore road (a91dd42), greenore, (total site area c. 4.88 hectare). The development comprising of operation and maintenance (o&m) facilities will serve as the support base for future offshore wind arrays in the irish sea. The proposed development will comprise of: (i) three standalone buildings, each with a gross floor area (gfa) of 1,670 sqm, comprising 681 sqm warehouse floor space, 322 sqm office space and 667 sqm plant, welfare, storage, ancillary and circulation space per unit. The height of each unit ranges from 7.2m for the warehouse (single-storey / double-height space) to 13.5m max for the office 3-storey element. 76 car parking spaces are proposed distributed adjacent to the units including 6 no. Disabled parking spaces and 15 no. Electric vehicle (ev) charging spaces. Each building includes an internal bike storage room, with 20 spaces per building. Each building includes rooftop solar photovoltaic panels. (ii) nearshore works including dredging of harbour sediments to
  • 4m chart datum to provide navigable water depths, new quay wall (70m), a 40m anti-slip access ramp, floating pontoon for berthing crew transfer vessels (ctv’s). 9 no. Berths are proposed, with an additional 2 no. Layby berths and a push-on / service berth adjacent to the new quay wall. (iii) improvement works to the quay deck including installation of a new reinforced concrete deck with surface water management system incorporating silt traps and hydrocarbon interceptors, and berth infrastructure including bollards, fenders, ladders, lifesaving equipment, power outlets and fire hydrants. (iv) surface car park at the residential site on shore road comprising 135 car parking spaces, including ducting for 30 no. Ev charging spaces, relocation of existing entrance on shore road by c. 6m to the east, new boundary wall to shore road and a pedestrian access route from the car park through port lands to the o&m units crossing improved public realm at top of euston street. (v) re-instatement of former open hydro carpark (62 spaces) until the surface car park on shore road is operational. (vi) upgrade to public/private realm in the foreground of the existing greenore port office building, including upgrade of existing entrance to former open hydro carpark, new pedestrian gate, new feature wall entrance, removal of 6 port car parking spaces, link to new pedestrian route from surface carpark includi

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Euston St, Greenore, LouthMar 2026€289,000193 m
15 Euston St, Greenore, DundalkNov 2025€270,000220 m
Stone Cottage, Seafront, GreenoreApr 2025€210,000301 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 May 2024
  2. Further information requested18 July 2024
  3. Further information received29 October 2024
  4. Decision due23 December 2024
  5. Decision issued19 December 2024
  6. Grant issued25 April 2025
  7. Appeal submitted22 January 2025
  8. Permission expiry24 April 2035

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.