Planning Permission Ireland
GrantedAlterationsDecided 17 January 2025

FORMER CONNECT CREDIT UNION BUILDING, ANNAGASSAN VILLAGE, DUNLEER

Alterations to a previously approved conversion of a former credit union into a house in Annagassan.

2460712 · Louth County Council · Lodged 19 November 2024

Reference
2460712
Authority
Louth County Council
Register status
Decided
Type
PERMISSION
Received
19 November 2024

Summary

AI-generated

Permission is sought for alterations to a previously granted planning permission (ref 2360471) for the change of use of a former credit union to a dwelling. The changes include replacing a section of the pitched roof, associated elevational changes, and alterations to the rear windows.

Alterationsalterationsconversioncredit union
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for alterations to a previously granted planning permission reference number 2360471 (change of use of a former credit union building to a dwelling house with various alterations and extensions to the existing building, construction of a new two storey garage, alterations to the existing boundaries, the proposed development will utilise the existing public drainage and water facilities / connections and all associated site development works). The alterations to include: replacement of a section of the existing pitched roof with associated elevational changes; alterations to as granted windows to the rear elevation. Note all drainage, boundaries and siteworks as per original as granted scenario

Land-use zoning

What this land is zoned for

Town or Village CentreLC
To support the development, improvement and expansion of town or village centre activities.

National zoning type: Commercial, retail

Objective set by the Louth County Development Plan (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 April 2025.

Notified floor area: 209.06

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
56 The Saltings, Annagassan, LouthOct 2025€250,000101 m
Apartment 29, The Saltings, AnnagassanJan 2025€237,500186 m
22 The Saltings, Annagassan, LouthJul 2025€277,000216 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 November 2024
  2. Decision due22 January 2025
  3. Decision issued17 January 2025
  4. Grant issued17 February 2025
  5. Permission expiry14 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.