Planning Permission Ireland
GrantedInfrastructureDecided 1 September 2023

Shragraddy, Bangor Erris, Ballina

Restoration and stabilisation of 170m of riverbank along the Owenmore River using rock armour and soft engineering.

2333 · Mayo County Council · Lodged 27 January 2023

Reference
2333
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
27 January 2023

Summary

AI-generated

The project involves restoring and stabilising approximately 170 metres of eroded riverbank along the Owenmore River. Works will include placing rock armour stone on the lower sections and using soft engineering measures, such as coir/jute matting and re-vegetation, on the upper sections. A Natura Impact Statement (NIS) has been submitted.

Infrastructureriverbankenvironmentalengineering

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The restoration and stabilisation of approximately 170m of riverbank along the owenmore river where erosion has occured. These works will include the placement of rock armour stone to the lower sections of riverbank, and soft engineering measures to the upper sections of riverbank. The soft engineering measures will include the installation of coir/jute matting and re-vegetation works. A nis has been submitted.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Bangor Erris, Ballina, Co MayoMar 2025€130,000455 m
3 Barrack Road, Bangor Erris, Co MayoNov 2025€239,000479 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 January 2023
  2. Further information requested22 March 2023
  3. Further information received9 August 2023
  4. Decision due5 September 2023
  5. Decision issued1 September 2023
  6. Grant issued2 October 2023
  7. Permission expiry1 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.