Planning Permission Ireland
GrantedEnergyDecided 22 December 2023

Croaghaun West Srahnakilly and Bellacorick townlands, Bellacorick, Co. Mayo

Construction of a 114 Megawatt gas-fired peaking power plant capable of running on a natural gas and hydrogen mix.

2360028 · Mayo County Council · Lodged 7 February 2023

Reference
2360028
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
7 February 2023

Summary

AI-generated

The development will feature two open cycle gas turbine generators with 28-metre-high exhaust stacks. It will also include a gas network connection installation, an electrical substation, fuel storage tanks, a replacement bridge, and associated grid connection works.

Energypower plantgashydrogeninfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of a 114 megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. Open cycle gas turbine (ocgt) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include
  • Above ground installation (agi) to facilitate connection to the gas network, with compound area of 1,600 m²
  • 3 no. Gas agi buildings
  • Admin & welfare block
  • Electrical substation with area of 3,800 m²
  • 1 no. Substation building
  • Electrical building
  • 3 no. Secondary fuel storage tanks with volume of 3,600 m³
  • Fire water storage tank & pumphouse
  • Sludge tank & pump house
  • Resurfacing, repair and improvement of existing site entrance
  • Replacement bridge
  • Gatehouse
  • Internal access roads; and
  • Associated grid connection works within the l52925 public roadway. The development will include the provision of 12 no. Parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years

Key dates

Timeline

  1. Application received7 February 2023
  2. Further information requested30 March 2023
  3. Further information received19 December 2023
  4. Decision due24 January 2024
  5. Decision issued22 December 2023
  6. Grant issued31 January 2024
  7. Permission expiry30 January 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.