Upgrades to an existing overhead power line circuit across multiple townlands.

2360261 · Mayo County Council · Lodged 4 July 2023

Reference
2360261
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
4 July 2023

Summary

AI-generated

The project involves restringing existing overhead line wires with higher capacity conductors and installing a fibre connection. It also includes replacing 20 polesets, relocating one poleset, and replacing three steel towers.

Infrastructuregrid upgradeinfrastructurepower lines

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The existing circuit is located in the townlands of gorteen, ardoughan, kilemoremoy, belleek, ballina, quignalecka, quignashee, ballyholan, behy more, corimla south, carrownlabaun, bunnyconnellan west, rathreedaun, drumsheen and bunnyconnellan east, co. Mayo. The proposed development will consist of: (i) the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection. (ii) the replacement of 20 no. Of the 63 no. Existing intermediate polesets (imps) with similar polesets. Any replacement polesets will be constructed at, or immediately adjacent to the existing structures that they will replace, will be along the same alignment as the existing line, with a height difference of between 1-2 metres, with the exception of imp52 where the height difference will be 4 metres. (iii) the relocation of imp49 on the behy road (townland of ballyholan), to be replaced with 2 no. New polesets (imp49 and imp49a) to the east and west of the existing poleset, along the route of the existing line. (iv) the replacement of 3 of the 13 no. Existing steel towers (angle masts) with similar structures. (v) the carrying out of civil works for tower foundation strengthening at 3 no. Locations and monopole-foundation strengthening at 1 no. Location and bar member replacement works at 3 no. Locations. (vi) the replacement of hardware and fittings at all locations. (vii) the replacement of crossarms at 20 no. Locations. (viii) all associated works within the existing glenree and moy substations to accommodate the uprated 110kv overhead line. (ix) other temporary associated and ancillary development works required for the purpose of the uprate, including construction compounds, the installation of silt traps, silt fences, access tracks, ground protection mats and temporary watercourse crossings. (x) all associated site development works above and below the ground to gain access to the existing structures including vegetation clearance, remedial works on concrete shear blocks, replacement of individual tower members and bolts, replacement of hardware and insulators, replacement of dampers, installation of line identification and danger notices and anti-climbing guards, the provision of temporary access routes and other ancillary works necessary to facilitate the proposed development. The planning application is accompanied by a natura impact statement.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Behymore, Ballina, MayoMar 2025€195,000248 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 July 2023
  2. Decision due28 August 2023
  3. Decision issued23 August 2023
  4. Grant issued23 September 2023
  5. Permission expiry22 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.