GrantedInfrastructureDecided 11 April 2024

Scoil Bhreandáin, Eachleim, Belmullet Co. Mayo

Demolition of a storm porch and construction of two extensions at Scoil Bhreandáin.

2460065 · Mayo County Council · Lodged 21 February 2024

Reference
2460065
Authority
Mayo County Council
Register status
Decided
Type
PERMISSION
Received
21 February 2024

Summary

AI-generated

The project involves the demolition of an existing 2 sq.m storm porch and the construction of a rear extension to accommodate two new classrooms. A front extension will also be built for a new entrance lobby and accessible toilet, alongside minor internal alterations.

Infrastructureschoolextensiondemolition
Floor area
185 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission to carry out works to existing primary school at scoil bhreandáin, eachleim, belmullet, co. Mayo f26p704. Proposed works will consist of: (1) demolition of existing storm porch (2sq. M); (2) construction of new extension (a) to the rear of the school to accommodate 2 new (80sq. M) mainstream classrooms, total floor area of (166.0sq. M). (3) construction of new extension (b) to the front of the school to accommodate new entrance lobby and user assisted wc (10.5sq. M), total floor area of (18.6sq. M). (4) carrying out of minor internal alterations and changes to existing resource room and principals office, (5) to construct new canopy, windbreak and enlarged signage to new front entrance. (6) to recess front boundary wall and entrance, (7) connections to existing site services (8) carrying out of all associated ancillary site works

Land-use zoning

What this land is zoned for

Rural Village Consolidation ZoningRV
To provide for, protect and strengthen the vitality and viability of Tier V Rural Villages, through consolidating development, and encouraging an appropriate mix of uses commensurate with the character, capacity and connectivity of the rural village, incl

National zoning type: Built up area

Objective set by the Mayo County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received21 February 2024
  2. Decision due16 April 2024
  3. Decision issued11 April 2024
  4. Grant issued12 May 2024
  5. Permission expiry11 May 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.