Planning Permission Ireland
GrantedHousing estateDecided 19 June 2025

Bohernasup, Ballina, Co Mayo

Demolition of unfinished structures and construction of 52 houses in Ballina.

2560008 · Mayo County Council · Lodged 20 December 2024

Reference
2560008
Authority
Mayo County Council
Register status
Appealed
Type
PERMISSION
Received
20 December 2024

Summary

AI-generated

The development involves the demolition of existing unfinished terrace block structures and the construction of a 52-unit housing estate. The estate will feature detached, semi-detached, and terraced houses.

Housing estatehousing estatedemolitionresidential
Residential units
52

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: (1) demolition of existing unfinished terrace block structures on site. (2) construction of a housing development with a total of 52 no. Dwellings in detached, semi-detached and terrace configurations, consisting of 20 no. 5-bed detached houses, 6 no. 4-bed semi-detached houses, 4 no. 3-bed semi-detached houses, 10 no. 3-bed terrace houses, 11 no. 2-bed terrace houses and 1 no. 2 bed detached single storey house. (3) associated development and works including the extension of existing pedestrian and vehicular access to lansyn bohernasup, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.

Land-use zoning

What this land is zoned for

New ResidentialR1
It is an objective to provide for new residential development, associated facilities and services

National zoning type: New/proposed residential

Objective set by the Ballina Local Area Plan (2024–2030). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Corner View, Boharnasup, BallinaDec 2025€282,000202 m
27 Bellek Manor, Bellek, Ballinaprice excludes VATNov 2025€436,407203 m
26, Belleek Manor, Ballinaprice excludes VATJun 2025€421,873216 m
Belleek Rd, Ballina, MayoMay 2025€187,500306 m
Erris, Beleek Castle Avenue, BallinaDec 2025€165,000309 m
6 Castle Row, Ballina, Co MayoMay 2025€215,000330 m
Arbuckle Row, Ballina, Co MayoJul 2025€88,000368 m
22 Marian Crescent, Ballina, Co MayoSept 2025€225,000372 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2024
  2. Further information requested20 February 2025
  3. Further information received26 May 2025
  4. Decision due22 June 2025
  5. Decision issued19 June 2025
  6. Appeal submitted10 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.