Planning Permission Ireland
GrantedCommercialDecided 3 May 2023

Knocks, Dunshaughlin, Co. Meath

Construction of a major service station and EV charging hub near Dunshaughlin.

221047 · Meath County Council · Lodged 10 August 2022

Reference
221047
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
10 August 2022

Summary

AI-generated

The proposed development on a 3.4-hectare site includes 36 EV charging points, 10 fuel pumps, and a 968 sqm services building. The building will house a convenience store, two food outlets (one with a drive-thru), a coffee area, and seating for 166 people.

Commercialev chargingservice stationdrive thru
Floor area
968 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The provision of a service area and electric vehicle charging hub and all associated works on a site of approximately 3.4 hectares in area. The proposed development includes 36 no. Ev charging points (parking spaces) with a canopy over (maximum height of 3.2 metres); 8 no. General vehicle fuel pumps with a canopy over (maximum height of 5.6 metres) and 2 no. Hgv fuel pumps with canopy over (maximum height of 5.6 metres) together with underground fuel storage tanks and ancillary pipe works. Provision is made for an ancillary amenity/services building with a gross floor area of approximately 968 sqm that includes: a retail convenience store with part off-licence (total 100sqm net sales area); 2no food outlets (1 no. With a drive-thru function) and a coffee area, ancillary food preparation area, welfare facilities, and a central seating area (166 no. Seats). Screened plant (approximately 63 sqm in area) and areas for the fixing of pv panels are proposed at rooftop level. Externally, provision is made for 2 no. Picnic areas (100 sqm each); a children's play area (58 sqm); a driver exercise area (54 sqm); 92 no. Standard car parking spaces, 4 no. Family spaces, 6 no. Accessible spaces, 6 no. Staff car parking spaces, 1 no. Staff ev charging space, 3 no. Coach parking spaces, and 12 no. Hgv parking spaces (including 2 no. Adr spaces) together with 12 no. Bicycle parking spaces, a total of 33 no. Signs (both illuminated and non-illuminated) are proposed (with a cumulative area of approximately 168.05 sq,m) to include: 2 no. Illuminated totem signs (measuring 8.8m (height) x 1.6m (width) with a combined area of 28.46 sqm); 1 no. Illuminated totem sign (measuring 17.5m (height) x 2.5m (width) with an area of 43.75 sqm); wall mounted signage to the services building (37.57 sqm), free-standing (4.76 sqm) and logo and branding signage to all canopies with a total area of (53.49 sqm), other associated works include the provision of an esb sub-station (28 sqm); a new left-in and left-out vehicular junction onto the r125 with directional traffic island; raise/fill the site by approximately 0.5 to 1.5 and grading to existing site levels; relocating an approximately 210m long section of n unnamed stream c. 25 metres northwards within the site; and all other ancillary site development, utilities, landscaping, lighting and boundary works/landscaping. The planning application is accompanied by a natura impact statement. Significant further information/revised plans submitted

Land-use zoning

What this land is zoned for

E2 - General Enterprise and EmploymentSI
General Enterprise and Employment

National zoning type: Industrial, enterprise, employment

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 October 2024.

Notified floor area: 1,004

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 August 2022
  2. Further information requested3 October 2022
  3. Further information received23 February 2023
  4. Decision due4 May 2023
  5. Decision issued3 May 2023
  6. Appeal submitted30 May 2023
  7. Appeal decided29 July 2024
  8. Permission expiry28 July 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.