GrantedCommercialDecided 24 July 2023

Dunboyne Road, Moygaddy, Maynooth Co. Meath

Construction of a 156-bedroom nursing home, a three-storey Primary Care Centre, and associated road works.

221251 · Meath County Council · Lodged 23 September 2022

Reference
221251
Authority
Meath County Council
Register status
Withdrawn
Type
PERMISSION
Received
23 September 2022

Summary

AI-generated

The development consists of a new two-storey, 156-bedroom nursing home and a new three-storey Primary Care Centre. It includes 161 car parking spaces, 160 bicycle spaces, a wastewater pumping station, and road improvement works along the R157 which abuts the Carton Demesne Wall, a protected structure.

Commercialnursing homemedicalprotected structureinfrastructure
Storeys
3
Floor area
11,625 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • Construction of a new two-storey nursing home of 156 no. Bedrooms with a gross floor area (gfa) of 8,576m2, including vehicular drop­ off area and service road
  • Construction of a new three-storey primary care centre (pcc) with a gross floor area (gfa) of 3,049m2, including vehicular drop-off area
  • The development includes a shared surface car park providing 161 no. Car parking spaces (comprising of 151 no. Standard car parking spaces and 10 no. Accessible car parking spaces) and approximately 160 no. Bicycle parking spaces
  • Provision of foul and surface water drainage including an underground wastewater pumping station
  • Connection to potable water supply at kildare bridge
  • Provision of communal (semi-private) and public open space
  • Provision of hard and soft landscaping including amenity equipment, fencing and gates
  • Provision of substation and public lighting
  • Proposed road improvement and realignment works along the r157 which abuts the carton demense wall which is a protected structure (rps ref 91556), including: i. Construction of a new 2-way, 6m-wide access road from the r157 dunboyne road to include a priority t-junction on the rl57 which includes a right-turn lane from the r157 into the access road, ii. Upgrade works to a section of the rl57 from the new site entrance south to kildare bridge on the r157 (representing delivery of a 15m-wide portion of the maynooth outer relief road (moor)), including creation of a new 2m -wide footpath, 3m-wide cycle lane and pedestrian and cycle link adjacent to kildare bridge, iii. Provision of pedestrian and cycle improvement measures
  • All other site development works and services ancillary to the proposed development
  • A natura impact statement (nis) and environmental impact assessment report (eiar) will be submitted to the planning authority with the planning application. Significant further information/revised plans submitted on this application

Land-use zoning

What this land is zoned for

G1 - Community InfrastructureCI
Community Infrastructure

National zoning type: Mixed/general community services/facilities uses

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
62 Linden Avenue, Linden Demesne, MaynoothOct 2025€612,264473 m
18 Castlepark Drive, Dunboyne Road, MaynoothOct 2025€727,136494 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 September 2022
  2. Further information requested17 November 2022
  3. Further information received15 May 2023
  4. Decision issued24 July 2023
  5. Appeal submitted18 August 2023
  6. Application withdrawn6 February 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.