Planning Permission Ireland
Awaiting decisionRetention

Drumsawry or Summerbank, Oldcastle, Co. Meath

Retention of a tourism log cabin and permission for outdoor wellness and recreational facilities in Oldcastle.

22271 · Meath County Council · Lodged 2 March 2022

Reference
22271
Authority
Meath County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
2 March 2022

Summary

AI-generated

This application seeks retention for an existing dormer-style log cabin used as tourist accommodation, alongside its wastewater treatment unit. It also seeks permission to upgrade the wastewater system, construct an outdoor recreational/arts room, a bike storage shed, a wellness/sauna area, and a barbecue hut.

Retentiontourismretentionglamping

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention permission for (1) existing dormer style log cabin operating as tourism accommodation ancillary to the adjoining campsite (2) waste water treatment unit and percolation area (3) all ancillary site works. Permission for (1) upgrade of existing waste water treatment unit and percolation area (2) to close up an existing entrance and remove hardcore surfaced driveway (3) to construct an outdoor recreational and arts room with covered patio area ancillary to the dormer style log cabin (4) to construct a rental bike storage shed adjacent to existing on site meeting room (5) to construct a covered out door wellness, sauna and hot tub area (6) to construct a barbeque hut type building (7) and all ancillary site works

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received2 March 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.