Planning Permission Ireland
Awaiting decisionEnergy

Towlands of Rathdrinagh Sicily Thomastown, Rahill Drumman & Knockcommon, near the town of Duleek Co Meath

A large-scale solar farm on 188.9 hectares near Duleek.

23499 · Meath County Council · Lodged 11 May 2023

Reference
23499
Authority
Meath County Council
Register status
Invalid or incomplete
Type
PERMISSION
Received
11 May 2023

Summary

AI-generated

A ten-year permission and 35-year operational life is sought for a solar farm spanning 188.9 hectares near Duleek. The development includes ground-mounted solar panels, inverter stations, security fencing, and site entrances, with a separate application planned for an onsite 110kV substation.

Energysolarrenewableinfrastructure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A ten year permission and 35 year operation life for a solar farm described herein. The total site area for the proposed development is 188.9 hectares consisting of the following: solar photovoltaic panels on ground mounted steel frames and associated hard standing, inverter/transformer stations, underground power and communication cables and ducts, boundary security fence, cctv cameras, upgraded internal access tracks, new internal access tracks, 2 no. New site entrances along the l5608 local road, underground electrical and communications cabling for approximately 700m along the l5608 local road and all associated services and development works including drainage infrastructure, temporary construction compound and landscaing. As part of a separate strategic infrastructure development (sid) application for consent, consent will be sought fo rthe provision of a 110kv onsite electrical substation and associated works from an bord pleanala. This planning application is accompanied by a natura impact statement

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received11 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.