Planning Permission Ireland
Awaiting decisionCommercial

Rath, Ashbourne, Co. Meath

Construction of a two-storey family entertainment building next to the Pillo Hotel in Ashbourne.

2360084 · Meath County Council · Lodged 8 June 2023

Reference
2360084
Authority
Meath County Council
Register status
Withdrawn
Type
PERMISSION
Received
8 June 2023

Summary

AI-generated

Permission is sought for a 2,443.6 sqm two-storey building containing a bowling alley, bumper cars, laser maze, games areas, and a soft drinks bar. The development also includes 103 new parking spaces and alterations to existing hotel parking.

Commercialleisurebowling alleyhotelparking
Storeys
2
Floor area
2,444 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The proposed development will consist of permission to construct
  • A two storey building of 2,443.6sq m, to the south of the existing pillo hotel site. The ground floor of the proposed building will consist of an area of 1315.4sq m, and the first floor will have an area of 1128.2sq m
  • The ground floor will contain a reception, soft drinks bar, bowling alley (8 lanes), toilets, laser maze, kitchen, freezer room, food area and double height storage area. The first floor will consist of communications room, bumping cars, games and ‘party areas’
  • Permission is sought for advertisement signage (13.4 sqm) to the north (front) and west (side) elevations on the proposed building
  • Permission is also sought for 103 no. Additional parking spaces, to the northeast of the proposed building, to accommodate adequate parking on site
  • Alterations and replacement of 63 no. Car parking spaces to the existing hotel parking to the west of the proposed building
  • Connections to the existing services at pillo hotel, landscaping and all ancillary site works

Land-use zoning

What this land is zoned for

D1 - TourismTR
Tourism

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received8 June 2023
  2. Further information requested31 July 2023
  3. Further information received13 February 2024
  4. Application withdrawn8 March 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.