Ballindery House, Ballinderry, Longwood Co. Meath

Restoration and refurbishment works are planned for Ballindery House, a protected structure in Longwood.

2365 · Meath County Council · Lodged 25 January 2023

Reference
2365
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
25 January 2023

Summary

AI-generated

The development consists of the restoration and refurbishment of Ballindery House, a protected structure. Works include external lime plastering, installing new double-glazed timber sliding sash windows, internal layout modifications, a new staircase, and a new wastewater treatment system.

Alterationsrestorationrefurbishmentprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of restoration and refurbishment of existing house which will include the following: (a) pointing and lime plastering to all external walls. (b) remove temporary blockwork from existing window openings and fit new double glazed timber sliding sash windows throughtout. (c) new timber floors and restoration of existing joinery internally. (d) refurbishment of existing roof and associated parapets. (e) modifications to internal plan layout. (f) lime plastering to internal walls. (g) new staircase from basement to first floor. (h) new external doors. (i) installation of proprietary waste water treatment system and polishing filter together with all associated site works. This is a protected structure - id. No. Mh047-109

Land-use zoning

What this land is zoned for

RA - Rural AreaRU
Rural Area

National zoning type: Mixed/general primary sector uses, including 'rural'

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received25 January 2023
  2. Decision due21 March 2023
  3. Decision issued20 March 2023
  4. Grant issued2 May 2023
  5. Permission expiry1 May 2028

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.