Planning Permission Ireland
GrantedChange of useDecided 19 November 2024

Main Street and Rear of Main Street adjacent to Bridge Park, Nobber, Co. Meath A82 A3E5

Retention of veterinary surgery conversion and permission for a new first-floor apartment in Nobber.

24388 · Meath County Council · Lodged 27 September 2024

Reference
24388
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
27 September 2024

Summary

AI-generated

Retention is sought for converting rear sheds into treatment and recovery rooms for a veterinary surgery. Planning permission is also sought to raise the rear walls, construct a new roof, and build a two-bedroom self-contained apartment at first-floor level.

Change of useveterinaryapartmentretention
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development consists of and will consist of the following: retention permission for: (1) the conversion of the rear sheds of the existing surgery at ground floor level for use as treatment rooms, recovery room for small animals and store rooms. (2) and ancillary site works. Planning permission for: (1) to complete the ground floor stores area. (2) to raise the rear walls and construct a new roof over the entire rear of the building. (3) to construct a two bedroomed self contained apartment at first floor level with access from a new stairs in the rear yard. (4) to set back and alter the existing side entrance to the yard. (5) connect the new apartment to existing foul and water connections. (6) and all ancillary site works

Land-use zoning

What this land is zoned for

B1 - Commercial Town or Village CentreUC
Commercial Town or Village Centre

National zoning type: City/Town/village Centre, central area

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Loreto, Nobber, MeathSept 2025€350,000136 m
18 Cluain Beag, Nobber, MeathSept 2025€300,000191 m
29 Cluain Beag, Nobber, MeathDec 2025€240,000192 m
12 Cluain Beag, Nobber, MeathJun 2026€288,000248 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 September 2024
  2. Decision due21 November 2024
  3. Decision issued19 November 2024
  4. Grant issued10 January 2025
  5. Permission expiry9 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.