Planning Permission Ireland
GrantedInfrastructureDecided 15 January 2025

Mill Road Colp West, Drogheda, County Meath

Construction of a new 1,000-pupil, three-storey post-primary school in Drogheda.

2460133 · Meath County Council · Lodged 23 February 2024

Reference
2460133
Authority
Meath County Council
Register status
Decided
Type
PERMISSION
Received
23 February 2024

Summary

AI-generated

The project involves the construction of a new 11,302 sqm school building containing 43 classrooms, laboratories, a multi-purpose hall, and a physical education suite. It also includes the removal of existing temporary accommodation blocks, the demolition of a derelict agricultural building, and a new vehicular access junction.

Infrastructureschooleducationdemolition
Storeys
3
Floor area
11,302 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development includes the removal of interim accommodation permitted under ref. No. Lb190739 and ref. 21/2336, and the construction of a new, 1,000 no pupil post-primary school (roll no. 68348a), which will comprise of 43 no. Classrooms, with associated laboratories and specialist classrooms, multi-purpose hall, a physical education suite including a physical education hall, and all ancillary teacher and pupil facilities with a gross floor area of c. 11,302 sqm over 3 no. Storeys. The proposal includes the removal of all interim accommodation on site, arranged across 12 no. Blocks, with a cumulative gfa of c. 4,203sq m (previously permitted under reg. Ref. Lb190739 and reg. Ref. 21/2336) including the removal of 1 no. Interim accommodation block, constructed under exempted development (c. 249 sq m). The proposal also includes the demolition of a single-storey c. 190 sqm derelict building, associated with the former agricultural use of the site. Vehicular access to the subject site is proposed via a new priority-controlled t-junction located on the new link road to the southwest of the site, with associated tie-in works to the existing road network; 2 no. Pedestrian and cyclist access points and 2 no. Pedestrian only access points to the southwest boundary of the site; staff and visitor parking spaces and designated drop-off and set down facilities. The development will also include the provision of 1 no. External storage building (c. 50 sqm); 1 no. Bin store; bicycle and scooter parking; vehicle and bus drop off/set down areas; internal access roads; hard and soft play areas including 6 no. Hard play court areas; piped infrastructure and ducting; plant and plant room; lpg tanks compound; electrical switch room; landscaping and boundary treatments; pv panels; ev parking facilities; external courtyards; disabled car parking spaces; site clearance works, comprising of the partial removal of hedgerows and a number of trees; stepped access routes; street and security lighting; signage; 2 no. Attenuation tanks; surface water drainage and suds measures (including green roof provision); 5 no. Flagpoles; piped infrastructural services and connections, hard and soft landscaping, esb substation, changes in level and all associated site development and excavation works above and below ground. The total site area is 5.26ha. Significant further information/revised plans submitted on this application

Land-use zoning

What this land is zoned for

WL - White LandsR1
White Lands

National zoning type: Strategic reserve, White land

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Pk Sq, Grangerath Colpe Cross, DroghedaMay 2026€365,000315 m
47 Park Ridge, Grange Rath, DroghedaNov 2025€214,000361 m
58 Park Ridge, Grange Rath, Dublin Rd DroghedaDec 2025€285,000361 m
Apt 16, Park Ridge, GrangerathNov 2025€250,000361 m
49 Park Ridge, Grange Rath, DroghedaApr 2026€280,000361 m
22 Park Ridge, Grange Rath, DroghedaJan 2026€278,000361 m
3 Park Ridge, Grange Rath, DroghedaMay 2025€315,000368 m
4 Park Gate, Grange Rath, Colpe CrossJul 2025€380,000381 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 February 2024
  2. Further information requested17 April 2024
  3. Further information received6 November 2024
  4. Decision due16 January 2025
  5. Decision issued15 January 2025
  6. Grant issued27 February 2025
  7. Permission expiry26 February 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.