Meath Hill 110kV substation and adjoining land, Meath Hill Drumconrath Navan, Co. Meath
Upgrades to a 110kV substation in Meath to connect a battery energy storage system.
2460169 · Meath County Council · Lodged 8 March 2024
- Reference
- 2460169
- Authority
- Meath County Council
- Register status
- Decided
- Type
- PERMISSION
- Received
- 8 March 2024
Summary
AI-generatedThe development involves upgrading the existing Meath Hill 110kV electrical substation to facilitate connection to a consented battery energy storage system (BESS). Works include a new electrical line bay, a busbar sectionaliser, and replacement fencing.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Upgrading of an existing 110kv electrical substation to facilitate connection to a consented battery energy storage system (bess) (ref. Ka/180156). Upgrade works to the substation include construction of a new electrical 110kv line bay comprising of
- Cable sealing end (cse) and concrete plinth; surge arrestor (sa) and concrete plinth; disconnect switch to earth and concrete plinth; voltage transformer (vt) and concrete plinth; current transformer (ct) and concrete plinth; circuit breaker (cb) and concrete plinth; disconnect switch and concrete plinth; all necessary electrical cabling to connect above listed equipment with existing busbar and control cabling; works to include all necessary foundations and concrete ductwork
- Construction of an electrical busbar sectionaliser to divide the existing 110kv busbar. New equipment to be installed would include: current transformer (ct) and concrete plinth; circuit breaker (cb) and concrete plinth; all necessary electrical cabling to connect above listed equipment with existing busbar and control cabling
- Replace the northern section of existing steel wire fence with a 2.6m tall palisade fence including a gate
- Construction of an interface (marshalling) kiosk and plinth located at the boundary between esbn substation land folio and bess (approved planning permission – register no. Ka/180156). Kiosk to be enclosed by 2.6m tall palisade fence including a gate
- Construction of approx. 11m (length) of 4m wide walkway comprising of crushed limestone on geotextile, to connect meath hill substation fenced enclosure with the interface (marshalling) kiosk fenced enclosure
- Excavation and construction of approx. 23m of underground cable trench (approx. 1.2m deep) to accommodate 110kv cable ducting and associated control and earth cabling ducts. The cabling would run between the cable sealing end located in the proposed new line bay in meath hill substation and the cable sealing end located into the consented bess
Land-use zoning
What this land is zoned for
“Rural Area”
National zoning type: Mixed/general primary sector uses, including 'rural'
Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| Meath Hill, Drumconrath, Navan | Nov 2025 | €190,000 | 478 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received8 March 2024
- Decision due2 May 2024
- Decision issued2 May 2024
- Grant issued18 June 2024
- Permission expiry17 June 2029
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
The development will consist of: the installation of approximately 4km of underground electricty transmission…
Drumgill Cornahoova Corratober , Ardagh & Meath Hill , Co. Meath
KA171177MeathLodged 9 Oct 2017Infrastructure
- Granted60 m away
Permission to construct a 30m high telecoms structure, carrying communication dishes and antennae, within an…
ESB's Meath Hill 110kv Substation Site , Meath Hill Drumconrath , Navan Co. Meath
KA190435MeathLodged 12 Apr 2019Infrastructure
- Awaiting decision60 m away
Permission to construct a 30m high telecoms structure, carrying communication dishes and antennae, within an…
ESB's Meath Hill 110kv Substation Site , Meath Hill , Slane Lower Co. Meath
KA190304MeathLodged 19 Mar 2019Infrastructure
- Awaiting decision120 m away
A 10 year permission for the construction of an energy storage facility within a total site area of up to…
Meath Hill , Ardagh , Co. Meath
KA180080MeathLodged 29 Jan 2018Energy
- Granted140 m away
A 10 year permission for the construction of an energy storage facility within a total site area of up to…
Meath Hill , Navan , Co. Meath
KA180156MeathLodged 20 Feb 2018Energy
- Awaiting decision270 m away
Construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an…
Meath Hill and Ardagh , between the settlements of Kingscourt and Drumconrath , Co. Meath
2460567MeathLodged 26 Jul 2024Energy
- Granted270 m away
Permission for the construction of an electricity storage facility comprising a Battery Energy Storage System…
Site adjacent to and northwest of Meath Hill Substation Meath Hill , and Ardagh between the settlements of Kingscourt and Drumconrath , Co. Meath
2560725MeathLodged 11 Jul 2025Energy
- Awaiting decision270 m away
Permission for the construction of an electricity storage facility comprising a Battery Energy Storage System…
Site adjacent to and northwest of Meath Hill Substation , Meath Hill and Ardagh between the settlements of Kingscourt and Drumconrath , Co. Meath
2560643MeathLodged 23 Jun 2025Energy
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedInfrastructure
Permission for development consisting of the installation of additional electrical equipment in the ESB…
lisdrumdoagh , Rackwallace , Monaghan
20531MonaghanLodged 9 Dec 2020
- Awaiting decisionEnergy
Construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an…
Meath Hill and Ardagh , between the settlements of Kingscourt and Drumconrath , Co. Meath
2460567MeathLodged 26 Jul 2024
- GrantedEnergy
Permission for a development consisting of the installation of additional electrical equipment in the ESB…
Lisdrumdoagh , Rackwallace , Monaghan
20143MonaghanLodged 29 Apr 2020
- Awaiting decisionEnergy
Permission for the construction of an electricity storage facility comprising a Battery Energy Storage System…
Site adjacent to and northwest of Meath Hill Substation , Meath Hill and Ardagh between the settlements of Kingscourt and Drumconrath , Co. Meath
2560643MeathLodged 23 Jun 2025
- GrantedInfrastructure
(a) Enabling works comprising: (i) the decommissioning and removal of plant and equipment from the existing…
Cornacarta , Ballymahon , Co. Longford
17198LongfordLodged 24 Jul 2017
- GrantedInfrastructure
10 Year Planning Permission for a physical extension of c. 562 sq.m to the existing electricity substation…
The Existing Cloyne 38kV Substation, Demesne, Cloyne, Co Cork
255257corkLodged 27 Jun 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.