Planning Permission Ireland
GrantedRetentionDecided 7 August 2025

3 Beach Grove, Laytown, Co. Meath A92P9N3

Retention of a rear garden room, a front porch, and a garage conversion to a utility room.

2560333 · Meath County Council · Lodged 2 April 2025

Reference
2560333
Authority
Meath County Council
Register status
Decided
Type
RETENTION
Received
2 April 2025

Summary

AI-generated

The application seeks retention for a 34.3 sqm garden room extension to the rear, and a 2.2 sqm flat-roof front porch. It also includes the retention of a garage conversion into a utility/storage room with window and rooflight installations.

Retentionretentiongarden roomgarage conversion
Floor area
37 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the retention of the construction of a garden room extension to the west (rear) of the property; totaling 34.3m², the construction of a flat-roof porch to the south of the property; totaling 2.2m², and the conversion of an existing garage attached to the existing property, into a utility/storage room, incl. The replacement of the street-facing garage door with a upvc window to match existing, and the addition of 2 no. Roof light windows. Significant further information/revised plans submitted on this application

Land-use zoning

What this land is zoned for

A1 - Existing ResidentialRS
Existing Residential

Objective set by the Meath County Development Plan 2021-2027 (2021–2027). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
3 Beach Grove, Laytown, MeathJun 2026€356,0001 m
2 South Shore Gate, South Shore Dr, Laytownnot full market priceMar 2026€270,00056 m
Apt 3 The Sidings, Laytown, MeathSept 2025€290,00082 m
4 South Shore Court, Laytown, MeathDec 2025€270,000116 m
15 South Shore Court, Laytown, County MeathFeb 2025€267,500136 m
20 Beach Grove, Laytown, MeathNov 2025€390,000167 m
28 Alverno Heights, Laytown, MeathMay 2025€290,000246 m
70 Alverno Heights, Laytown, MeathJan 2026€290,000250 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 April 2025
  2. Further information requested27 May 2025
  3. Further information received6 June 2025
  4. Decision due7 August 2025
  5. Decision issued7 August 2025
  6. Grant issued22 September 2025
  7. Permission expiry21 September 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.